Forum quick links
The vent calcs indicate a total area significantly lessthan Plf2
NC-2009 IEQp1:Minimum IAQ Performanceposted by Matt Dem on
Hi, I received a comment for (Design Preliminary Submission) ventilation calculations indicate a total area (3,055 sqf) significantly less than plf2 (6219 sqf) for the IEQp1 Our response is; The ar
MRc6 Waste Audit - Weight vs. Volume
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Alexis Voeltner on
We have always conducted waste audits using weight. We are seeking a more efficient means to calculating waste and recycling; is measuring the volume more efficient?
At the discretion of the permit holder
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Ashley Hu on
Hi Everyone, here's another question. The campus guidance from the LEED Canada Reference Guide states the following: " It is acceptable to achieve a Campus Shared Infrastructure compliance path
Never Have Cooling Towers
Pilot-Credits WEpc17:Cooling tower water useposted by Janice Rogers on
We do small renovations and have never installed or replaced a cooling tower. Do I still have a "no" credit even if I can't meet the criteria of the credit because we don't have the equipment?
Diverse "publicly available" use
NC-v4 LTc4:Surrounding density and diverse usesposted by Gina Rossi on
Working on a NC project on a private college campus and wondering how rigid USGBC is in defining "publicly available".
Pot washing sink
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Christine Harvey on
I saw a comment on this site that implied the water used for pot washing sinks and kitchen food prep sinks can be excluded from the calculations, can someone verify that for me?
FTE of hotel guests
NC-2009 PIf3:Occupant and Usage Dataposted by Rob Hink on
How do I calculate FTE of hotel guests? I know have to do it during non-peak time of year and peak time of year. Also what do I do for visitors and transients?
Between LEED v4 BD+C:NC or LEED v4 ID+C: CI
posted by Edgar Arevalo on
This may be a silly question, but I ask in order for some clarification. I have a particular question using the 40/60 rule.
Editing Form Values
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Ryan Kurlbaum on
I have uploaded all the necessary documentation and made sure that the excel file "supplemental daylight and views" is properly filled out, however on the credit form the "total regularly occupied
Who can be the CxA?
CI-v4 EAc1:Enhanced commissioningposted by emily reese moody on
Under v3, if a project wanted to pursue the enhanced Cx credit, a third-party CxA was required, and that entity completed the activities for both the prerequisite and the enhanced credit. Have the