Registering an individual project under a Campus project

LEED Guidance for Campuses and Multiple Buildings
posted by  Sean Quinn  on 

Does anyone know if we can register an individual project under a master site with only the master site name and ID information and without actually having access to the master site project on LEED

1
Mon Aug 14, 2017, 5:55 pm

Amphitheater Occupancy for SS and WE

General forums
posted by  Peter Doo  on 

Amphitheater Occupancy Project Location: United States Our project is the back stage area of a seasonal outdoor amphitheater concert venue.

0

WEc1 - Lav Efficiency Floor?

CI-2009 WEc1:Water use reduction
posted by  Jeremy Knoll  on 

Is there a lower limit to the lav flow rate below 0.5gpm that USGBC will accept? I saw something posted on the EPA's website awhile back, but am not finding it now.

1
Mon Jan 30, 2017, 6:53 pm

Inconsistency between BD+C and O+M

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Adam Stoker  on 

Despite efforts to better align the rating systems in LEED v4, there are some inconsistencies between the Enhanced Indoor Air Quality Strategies credits in BD+C and O+M.

0

Asbestos Abatement

ND-v2009 SLLc2:Brownfields redevelopment
posted by  Laura Steinbrink  on 

Can you comply with this credit if you are removing asbestos?

1
Fri Nov 21, 2014, 4:51 pm

LEED Lab

Pilot-Credits IPpc96:LEED Lab
posted by  Stacey White  on 

Cuesta College typically holds two LEED Lab sessions a year. We are lucky to work with several Community Partners working on projects in every rating system.

0

LEED v3 (2009) EAc1 & IEQc2 Outdoor Air - baseline vs. proposed

NC-2009 IEQc2:Increased ventilation
posted by  Todd Tewksbury  on 

Hi, When modeling the increased outdoor air venitlaiton per IEQc2 in the proposed and baseline buildings in EAc1 for LEED CS v3 (2009), should the baseline and proposed buildings have the same outd

1
Fri Jun 16, 2017, 7:33 am

IAQ management plan-during construction or before occupancy

NC-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Kali Wolin  on 

I am wondering if you can obtain the credit for Construction IAQ management plan DURING CONSTRUCTION along with BEFORE OCCUPANCY or if it is just one credit or the other.

1
Fri Jun 17, 2016, 12:42 am

Budget Method

NC-v4 EQc2:Low-emitting materials
posted by  LUCY WILLIAMS  on 

We have one non-compliant product on the project to date. It is a PVC glue- less than a liter was used.

1
Mon Aug 21, 2017, 1:25 pm
0