Forum quick links
Balancing Devices to meet ASHRAE 90.1 Mandatory Requirements
NC-2009 EAp2:Minimum energy performanceposted by Jorge Torres-Coto on
We have a project that is an industrial facility, it shares the CHW distribution piping between the comfort system and the process system. We are informing the CxTeam that it is required to have b
About disturbance considerations for retention walls.
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Mauricio Ramirez on
Hi everyone: I have a Project that needs to have large retention walls close to the office and main acces road.
Alternative Compliance Path
CS-2009 EAc1:Optimize energy performanceposted by Gabriela Mena on
Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if the
UE Ecolabel
CI-v4 EQc2:Low-emitting materialsposted by Gabriela Mena on
Is a EU Ecolabel Certificate an USGBC approved program? Kind regards
Leased off-street parking spaces
NC-v4 LTc7:Reduced parking footprintposted by Alicia Villanueva on
Hi! We are working on a project that does not provide any off-street parking on site but parking spaces for employees are leased from 3 nearby parking garages.
Desktop C02 Monitors
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Diego Garcia on
Hi, We are currently working on an office building, we want to achieve IEQ cr1, by installing C02 monitors in all spaces.
Waste generated by mobile offices within the project
NC-2009 MRc2:Construction waste managementposted by Tonatiuh Valencia on
what happens to the waste generated in the temporary offices within the project, are inorganic and organic waste.
Hybrid Urinals
CI-2009 WEc1:Water use reductionposted by Nilda De Coutte on
Hi, I would like to know if anyone has any information (case study, formal review, experience with) of any of the hybrid urinals currently available in the market.
commissioning tests
Healthcare-v2009 EAp1:Fundamental commissioning of building energy systemsposted by SAUL HERNANDEZ on
where can i find the tests of every system to be c commissioned?
Appendix G Oversizing
CS-2009 EAc1:Optimize energy performanceposted by Jorge Torres-Coto on
I have a reviewer requesting that we oversize the PROPOSED case for a "possibly conditioned in the future" warehouse. We have usually modeled the BASELINE case and PROPOSED case identical, then ove