Do all units have to run at 100% OA for this credit?
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Saju Varghese on
We have 4 A/C Units providing air conditioning to a building, two of them are 100% OA units and two of them are providing the total air supply cfm (OA + recirulated air) is 7000 cfm and 8600 respec
LEED ND _Exam
posted by Lakshmi Nair on
Hi Tristan , I am presently a LEED AP ( BD+C ). I was hoping to write LEED ND and become a LEED AP ( ND ). Should this be also done before June 15th ?
RH control with dew point control logic for IEQ 6.2
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by J I on
This project is based in highly humid place, we have used dew point control logic for AHU control. In this control logic, we are controlling 2-way chilled water valve from signal from supply air
Control Via Software Platform
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Andrew Gil on
Hello All, An unfortunate error was made when “multi-occupant space” was assumed by a team member to include a shared office space, and construction is complete.
HVAC system changed after certification completed
posted by Johannes Hopf on
Our project (LEED NC 2009 Gold) was certified 3 years ago. Now the new landlord would like to add humidification to AHU. Is the certification affected?
Elevators (Lift/Escalators) & LEED EAC1 credit
Schools-2009 EAc1:Optimize Energy Performanceposted by Ameet AA on
Can I include the Elevators (Lift/Escalators) in EAC1 credit calculation using the whole building simulation method? I was told by an Elevator supplier that Regenerative Converter in lift could be
Construction Review Submittal Deadline
posted by Sara Goenner Curlee on
I am working on a campus project targeting LEED Platinum under NCv2.2.
Polluted well water use
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Magda Aghababyan on
Dear all, We have a project that uses water from a polluted well for toilet flushing. The water is of low quality and is not drinkable.
Walking path through another building
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Heather DeGrella on
Our project is on a University campus but is not using the campus approach. University students cut through other campus buildings frequently.
furnitures installed before the flush out
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Benjie Herrera on
Can furnitures be installed before the flush out?