Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Rating System Selection [ID+C or BD+C]

LEED Rating System Selection
posted by  Amgad Khattab  on 

We have a project with the following description:

- the building is 10 floors and the owner renting the whole building.

- The Building envelope construction is complete.

1
Thu May 9, 2024, 10:22 pm

Lighting Control - Recording Studio

CI-v4 EQc6:Interior lighting
posted by  Edgar Arevalo  on 

I have a library project that has a recording studio in the basement.  After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor.  After

0

Option 2. Prescriptive Compliance

CI-v4 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

kinda embarrassed to ask this one, but here goes...

6
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Tue Aug 15, 2023, 3:51 pm

LEED Certification for an Existing Building

LEED v4.1 Discussion Forum
posted by  Mary Christel Eugenio  on 

Hi,
Is there a closing date for v4 now that we have v4.1?
We'll be registering for the LEED Certification of one of our properties for the first time.
Should we go for v4 or v4.1?

0

Furniture

NC-v4 MRc5:Construction and demolition waste management
posted by  Alexandra Kravel  on 

We are working on a partial renovation for a college building.

0

Furniture

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Alexandra Kravel  on 

We are working on a partial renovation for a college building.

0

Passive Survivability and Back-up Power During Disruptions

NC-v4 INc1:Innovation
posted by  Ridhwan Omar  on 

Hello LEEDUsers!

We have a resort hotel project in one of the islands in Micronesia.

6
Sustainability Lead
Parkhill
LEEDuser Basic Member
11 thumbs up
Mon Aug 14, 2023, 5:28 pm

UGR calculation

NC-v4.1 EQc6:Interior Lighting
posted by  Gustavo De las Heras Izquierdo  on 

Hello,

UGR can be calculated at different angles (30°, 45°, ... from nadir).

At what angle should the UGR be reported for credit compliance?

Thank you,

1
Fri Aug 25, 2023, 12:28 pm

Patient Rooms

Pilot-Credits WEpc147:All-Gender Restrooms
posted by  Vanessa Hostick  on 

Does anyone have experience documenting this pilot credit on a hospital?  It's unclear if the patient room should be included or excluded from the documentation and count.

0

locker roms

Pilot-Credits WEpc147:All-Gender Restrooms
posted by  Belén Palao  on 

Dear LEED coach, 

based on the All gender restrooms credit option 1 I had a consultation I wanted to make: 

3
LEED AP BD+C, WELL AP, Sustainable Building Consultant
ECOBUILD
LEEDuser Basic Member
14 thumbs up
Mon Aug 14, 2023, 4:05 pm