Forum quick links
Commissioning Requirements Off-site
posted by Alicia Villanueva on
Dear all, We are choosing to follow the option of off-site space but funded by the project for this credit. The location is an existing building near the project site.
2009 calculator - "private" bathrooms in a commecial facility
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Jessica Hawley on
I have mulit-story office building where the first floor has only one "private" bathroom for guests of the building to use in the lobby.
Project Sites within a LEED ND Boundary
posted by Philippa Cameron on
There are several sites located within our LEED ND boundary which are at an early project stage, all are large expansions of existing buildings and will still be under design at the time of submiss
CORE area and SHELL area
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Yodi Danusastro on
How to specify the IEQc 4.1 credit area limit for CS in SHELL area? in case for tenant spaces (that is still unoccupied), or the anchor tenant that has construction in parallel.
Baseline for Blow-out Fixtures
CS-2009 WEp1:Water Use Reductionposted by study topenergy on
According to the Water Use Reduction Additional Guidance (April 2013), when selecting the "Blow-out fixture" option, the 3.5 gpf baselne should also be used for the installed case.
Non recyclables in recycling stream
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Vanessa Seibert on
I think I know the answer but just want to double check.
Parking space ownership
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Gustavo De las Heras Izquierdo on
I see this credit mainly oriented to shopping malls and office buildings, but how should I address a project where all parking spaces are going to be SOLD to individual owners?
Parking spaces owned
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Gustavo De las Heras Izquierdo on
I see this credit mainly oriented to shopping malls and office buildings, but how should I address a project where all parking spaces are going to be SOLD to individual buyers?
Credit Complance/Justification in Spanish
posted by Peter Gibney on
For justifiying compliance with LEED credits for a Project in Spain, can supporting documentation, management plans, etc.
Target Finder: Design vs Target
NC-2009 EAp2:Minimum Energy Performanceposted by Rock Ridolfi on
All, new to energy modeling and reviewing the EAp2 online template trying to figure out the required inputs and reports for the Target Finder section, Design vs Target.