Forum quick links
Collection of hazardous waste.
ND-v2009 GIBc16:Solid waste management infrastructureposted by Martine Desbois on
Hi Eliot, the jurisdiction in which the project is located does not collect hazardous waste from the site but provides information on where the hazardous wastes can be deposited in the area.
IEQ p1 options
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Ramon Gomez on
Hi, we are filling the form for the IEQp1 and we have a doubt on what to choose between mechanically ventilated or mechanically conditioned, since we consider our areas mech.
outdoor delivery rates in a naturally ventilated space
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Vera Voropaeva on
After receiving the project's review we are asked to provide outdoor delivery rates.
Appealing period.
NC-2009 PIf4:Schedule and Overview Documentsposted by Jatuwat Varodompun on
Does the announced holidays of GBCI from 25 feb 2012-1 fan 2013 count as holidays and will not be included in 25 bussiness days of appealing preriod? thanks
How to handle offsite area owned by building owner
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Aron Weis on
The credit form is asking for a contract with the owner of the off-site property.
conflicting info on total materials cost
NC-2009 MRc4:Recycled Contentposted by Carrie Laurendine on
form im filling out says total material cost for csi divisions 3-10, as well as many of the divisions from 31. ive heard others say 31 isn't necessary. just 3-10. whats the consensus?
LI #2500/#10209 Shower Requirements for Mixed Use Buildings
posted by Michelle Rosenberger on
This section is a great idea, thanks.
specifics of signage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Carrie Laurendine on
Owner would prefer if the sign did not have the "noisy" icon of a "ghostbusters" red circle with line through it and a cigarette.
US Military Installation Abroad
Schools-2009 SSc1:Site Selectionposted by Denise Shimabukuro on
If the project is located in a foreign country on a US Military Installation, is this considered to be within the US? Technically, the APO Zipcode is California.
Mandatory provision 6.4.1.1 Equipment efficiency.
CS-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
I have a question about Mandatory provision 6.4.1.1 Equipment efficiency. Our project is a LEED Core and Shell project and a retail centre, 500 000 foot2.