Forum quick links
Electric Vehicle Charging Stations
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Susan F. on
This project has 224 FTE. We've provided 6 carpool spots and are installing 2 Electric Vehicle Charging Stations that services 4 dedicated EV parking spots.
CHP modelling Option 1 question
posted by Eszter Gulacsy on
We are trying to account for a CHP plant near our project in our energy model.
CHP modelling Option 1 question
NC-2009 EAc1:Optimize Energy Performanceposted by Eszter Gulacsy on
I think I posted this question on the wrong page beforehand, so I'll post it again here. We are trying to account for a CHP plant near our project in our energy model.
Rating system Selection NC or CI
posted by Sabrina B on
I am working on a building that is a part of a 6 building renovation made up of several different teams.
Warehouse Classification
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Prudence Ferreira on
We are trying to classify a winery. One of the areas is used for barrel fermentation, and is temperature controlled anywhere from 55-75 degrees based on the fermentation process.
Regularly Occupied Area vs. Unconditioned Area
posted by Clarice Sollog on
In filling out the Space Usage Type table on PI f3 I've noticed the form doesn't seem to 'like' when your regulalry occupied area is equal to your unconditioned area.
ASHRAE Table 6.8.1 Centrifugal Chillers
CS-2009 EAp2:Minimum Energy Performanceposted by Redy Truccolo on
Hi, in the table 6.8.1J of ASHRAE 90.1 there is a "condenser Flow rate" parameter, expressed in gpm/ton. My question is: to calculate this parameter do I have to use the nominal refrigeration powe
IAQ Testing using screening tool.
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Marcia Weekes on
Has anyone had experience with meeting the IAQ testing requirements using the Directsense IAQ Plus Screening tool from Graywolf Sensing Solutions.
Energy Star Rated Equipment
CI-2009 EAp2:Minimum Energy Performanceposted by Alex Spilger on
In regards to products that are included in this calculation, would a projector be included?
SIMULATION METHOD
CS-2009 EAp2:Minimum Energy Performanceposted by RICARDO GUEMEZ DIAZ on
HI, IM RICARDO GUEMEZ FROM MEXICO CITY, I AM IN THE PROCESS OF SIMULATING A WAREHOUSE FOR TENANT LEASING, THE OWNER IN ALL PROJECTS ONLY INCLUDE NATUARAL VENTILATION WITH IEQ-01 COMPLIANCE.