Forum quick links
P1 form 4: Date team expects to make first LEED submittal
NC-2009 PIf4:Schedule and Overview Documentsposted by John Eden on
If we are doing split review should this date be for the Design Review?
Only LEED CS inside proj. boundary
ND-v2009 GIBc1:Certified green buildingsposted by Karyn Rodrigues on
Considering that we have 6 LEED CS-certified buildings inside project boundary.
combine rail and bus for exemplary performance
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Courtney Royal on
hi, i was wondering if its possible to use a combination of subway and bus lines to achieve an ID EP credit. I think we've done that in the past, but I can't remember! Thanks!
Wind Energy
CS-2009 EAc6:Green powerposted by LEED Pro Consultant on
Hi, We are working on a project in Mexico. In order to comply with the credit requirments its valid to purchase electricity directly from a wind farm also in Mexico to get the points?
Served by part of large air-conditioning system
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Shirong Meng on
If the project spaces are served by a large VAV system which has mixing of central Outside air inlet and recirculation air, but the VAV system is also serving other tenant spaces.
90.1 Envelope Requirements
NC-2009 EAp2:Minimum energy performanceposted by Ruben Porter on
I'm trying to model a wood framed 4 story multifamily building, and the client wants to go without continuous insulation which is what's called for on table 5.5-4, resulting in a higher U value th
Appeal submitting period
posted by eirini matsouki on
hi there, one of our porjects is been denied a pre-requisite (EAp2) during the final design review and hence the project has entered the appeal process (enetring the 'design appeal review' - within
Covered Loading Dock - What is a parking space?
NC-2009 SSc7.1:Heat island effect - nonroofposted by Richard Woodward on
We are working on an urban alteration project which extends an existing building to cover an exterior loading dock, enclosing it within the new building.
SSC1 Path 5: Heat Island Effect: Roof
CI-2009 SSc1:Site selectionposted by Elliot Young on
I am working on a project with an existing ballasted roof & am wondering if we could get this credit.
Base case system for high equipment loads spaces
NC-2009 EAp2:Minimum energy performanceposted by Nandana Kumar on
The project is a 67000 sqft, six floored building. There are rooms with high equipment loads of greater than 20W/sft . The total area of these type of rooms adds up to 14,000 sqft.