Forum quick links
Mandatory Provitions - Fenestration and Doors
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hi, I have an air conditioned warehouse, where wine will be sotored, and it has two doors, with now vestibules.
Hand Sanitizer
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Johanna Ofner on
My project facility has hand sanitizing stations throughout the building filled with a EcoLogo (CCD-170) certified Hand Sanitizer. Does this count for anything?
Energy Star Appliances & Equipment as Innovation for LEED-NC
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Kris Callori on
Does anyone have experience submitting this for an innovation credit under the LEED-NC rating system?
Building Type Method or Space-by-Space on Construction phase
NC-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
If same Lighting Power Density (W/sf) was used in all zones during the design phase using Building Type Method, should we switch to space by space on its final stage?
Power Quality Meters
CI-2009 IDc1:Innovation in Designposted by David Edenburn on
Has anyone gotten a point for installing power quality meters? We have the usual power quantity meters, but the client is asking if there is a LEED incentive for cleaning up the power.
Pressure Sensitive Tape and Other Tapes
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Bruce Maine on
I keep being asked if Pressure Sensitive Tape qualifies as an adhesive subject to review for EQ c4.1. Normally I'd say no but some carpet installations use similar products.
Integrative Process Credit
posted by Melissa Wrolstad on
For BD+C: What do they mean by "cascading" in the phrase - "demonstrate how at least one on-site non-potable water supply source was utilized in cascading ways to reduce the burden on municipal sup
Site Assessment Credit
posted by Melissa Wrolstad on
Since this credit would need to happen before schematic design - doesn't it make sense to combine it with the Integrative Process section?
Low-Emitting and Fuel Efficient Vehicles
posted by Melissa Wrolstad on
Doesn't it make sense for this credit to be available to all building types?
Residential district density
CI-2009 SSc2:Development Density and Community Connectivityposted by monu goyal on
We have recently received final design review for our CI project, but the reviewer has denied SS Credit 2 Development density because of just figure not mentioned for residential district density.