Does mech engineer need to be PE to sign the "signature' box ?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Matt Dem on
Shall the person who enters his/her initials under signatory section ( for example IEQp1 or EAp2-1, 2-2, 2-3 ) be registered mechanical engineer (PE) ?
Empty parking spots
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by S. Macgregor on
We are installing alternative-fuel refueling stations, with preferred parking.
Water Efficiency Calculation
NC-2009 WEc3:Water Use Reductionposted by ABDUL MUTHALIB MOHAMED on
Hi, My project is a factory building. They are installing only Indian Water Closets and no Urinals. How to calculate water efficiency if Urinals are not used?
Dance School rating system: EB O+M School or not?
posted by Sophia Spano on
A dance school, one building- 90,000 SF is looking to get certified. I am unsure if it will be EB O+M, or EB O+M Schools. It is not k-12 and not a university.
Dance School rating system: EB O+M School or not?
posted by Sophia Spano on
Hi All, A dance school, one building- 90,000 SF is looking to get certified. I am unsure if it will be EB O+M, or EB O+M Schools. It is not k-12 and not a university.
CMP
posted by Tom Martin on
For v4 projects CM hours would automatically report, will this be the same for the new upgrade for v3?
Zero Lot Line calc
NC-v4 SSc4:Rainwater managementposted by Janika McFeely on
Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?
Third Party Review v4?
NC-v4 EAp2:Minimum energy performanceposted by SBS Department on
Does anyone know if either prereq EA - Minimum Energy Performance, or the Optimize Energy Performance credit need a third party review as it did under the CaGBC's LEED 2009?
Cnstrctn began with no LEED intent nw thy wnt rsume seeking LEED
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Aly Adel on
Hello! We have a project that started construction some time ago, and stopped 1 yr ago, leaving only phase 1 (concrete slabs only).
educational strategy
NC-2009 IDc1:Innovation in Designposted by jorge calderon on
Hi, we have a project that is an museum and auditorium with many educational components, as tour, video, activities, interactive web page, etc. Is it possible to obtain two ID credits for educatio