Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Applying the 0.5 gpm limit to toilets embedded in departments

Healthcare-v2009 WEp1:Water use reduction
posted by  Kim Shinn  on 

There is a discussion string under the LEED HC 2009 WEc3 credit forum about whether or not faucets in toilet rooms that are embedded in clinical departments (imaging, lab, therapy) should or should

0

Bicycle Facilities credit - required bike lane width

NC-v4 LTc6:Bicycle facilities
posted by  Michelle Bombeck  on 

Does anyone have any insight into the on-street bike lane width requirements for this credit?

1
Thu Jan 9, 2014, 8:31 pm

Interior Renovation

CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Jeremy Kuhre  on 

I'm seeking clarification on how this credit applies to an interior renovation. The existing tenant will actually remain in place during construction.

1
Fri Apr 25, 2014, 4:42 pm

MRc5 Pertaining to Modular Building

NC-2009 MRc5:Regional Materials
posted by  Tyler Stanley  on 

I work with a commercial modular building fabricator preparing to construct an office facility on the east coast.

1
Thu Jan 16, 2014, 7:13 pm

Multi-family apartment ventilation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Peter Lindabury  on 

We have a mechanical ventilation system that continuously supplies OA air into each apartment. Each apartment has a fan coil unit that conditions the apartment.

1
Mon Jan 13, 2014, 7:12 pm

Facade LPD requirement

CS-2009 EAp2:Minimum Energy Performance
posted by  Lolita Wu  on 

As the mandatory provision in ASHRAE 90.1 section 9.4, building facade lighting shall not exceed 0.2W/ft2 for each illuminated surface.

1
Fri Jan 10, 2014, 2:33 pm

combining SSc7.1 and 7.2

CS-2009 SSc7.1:Heat Island Effect—Nonroof
posted by  Alfonzo Collins  on 

I am working on a commercial building with an underground parking lot. 100% of all parking spaces are in this lot.

1
Mon Jan 13, 2014, 5:50 pm

LEED Addenda

General forums
posted by  Thomas Mazich  on 

I just got the email notifying me of the quarterly addenda with the reminder: "Project teams are required to adhere to rating system corrections and LEED Interpretations based on LEED registration

1
Fri Jan 10, 2014, 7:11 pm

baseline HVAC system selection

CS-2009 EAp2:Minimum Energy Performance
posted by  Agnieszka Rylska  on 

I would like to clarify the basis of baseline HVAC system selection in energy modeling. Selection is based, among others, on number of floors and conditioned floor area.

1
Fri Jan 10, 2014, 4:51 pm

LEED Rating System - which one?

LEED Rating System Selection
posted by  Katherine Sheesley  on 

Academic building of 75,000 SF on 3 floors with multipurpose class labs, faculty office and classrooms on a community college campus. Should the LEED v4 NC or LEED v4 Schools rating system be used

1
Fri Jan 10, 2014, 7:02 pm