EAc1.3 A - Equipment Efficiency
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Geoffrey Eddy on
I recently completed a CI in an old building with a constant volume Interior and console heat pumps on the perimeter.
wooden deck
NC-2009 SSc7.2:Heat Island Effect—Roofposted by BH . on
Hi, my question concern wooden deck on the roof. Does it need any SRI value? In general wood does not emite any heat so what will be an advantage it I paint it white or not?
Transferring numbers from EPA Statement of Energy Performance
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Janna Nash on
This question is specifically about taking info from Portfolio Manager and putting into LEED online v.3.
Stair Treads and Vinyl Wall Base
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Joseph Snider on
The Ref Guide lists wall base as one of the products certified by FloorScore. Does vinyl wall base need to be Floor Score. What about rubber stair treads in exit stairs?
Wood Flooring from Italy
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Sheela I on
We are installing wood flooring on our project and it is manufactured in Italy. As they do not have floor score certification - How can this product be documented?
Building Not Eligible for Energy Star Benchmarking - Outside U.S
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Amgad Khattab on
Our building is located in Egypt.
Can a smoking room be regarded as regulary occupied space?
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Noriko Nagazumi on
The definition of "regulary occupied space" is described as following; Regularly occupied spaces are areas where one or more individuals normally spend time (more than one hour per person per day o
Omitting an area from the building
posted by Mike D on
We are certifying an office building and there is one retail space at the ground floor of the building that the project team wants to omit from LEED certification. Can this be achieved? How?
Lighting Fixture of equipment rooms in Data Centre
CI-2009 EAp2:Minimum Energy Performanceposted by Natalie Wong on
We are now working on the lighting fixtures in a data centre. For the equipment rooms, if we follow the baseline in ASHRAE 90.7-2007 by using Space-by-space method i.e.