What if other element meets the intend of the credit ?

Pilot-Credits EQpc78:Design for active occupants
posted by  George Sebastian Naghiu  on 

What if we have an element that meets the intend of the credit but is not included in the list of 11 features from which to choose?

2
Technical Director, LEED
USGBC
LEEDuser Expert
225 thumbs up
Thu Dec 11, 2014, 6:27 pm

Glazing (windows) area - VOC

NC-v4 EQc2:Low emitting materials
posted by  Caroline PIN  on 

Dear all, Does we need to integrate glazing area in Option 2 : Budget calculation method ? Thank you for your help

7
Thu Dec 11, 2014, 4:20 pm

System 8 Fan Power Allowance

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

Dear All, I have a system 8 (VAV with PFP boxes) baseline and I had a reviewer's comment stating that: "The interior fan demand reported in Table EAp2-4 for the Baseline case exceeds th

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Dec 11, 2014, 3:52 pm
3
LEED Coordinator
Limak Construction Company
LEEDuser Basic Member
0 thumbs up
Thu Dec 11, 2014, 7:20 am

LEED EBOM, SS2 & Water Efficiency

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  AtSite Inc  on 

How many sq. ft. of landscape is needed to qualify for landscape credits?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Dec 11, 2014, 12:18 am

Lighting control in office space

NC-v4 EQc6:Interior lighting
posted by  Jeroen Sap  on 

I am working on an office building that has overhead lighting that is controlled based on occupancy sensors. The fixtures are grouped per 3,6 meters and there is no manual override.

3
LEED AP BD+C
Deerns Nederland B.V.
LEEDuser Basic Member
2 thumbs up
Wed Dec 10, 2014, 9:46 pm

Evaporative Chiller in EAp2?

NC-2009 EAp2:Minimum Energy Performance
posted by  Yastimy Jupson  on 

Hello everyone, i'm now joining a LEED project and the owner wants to use 50RT evaporative chiller in their building, but in ASHRAE standard 90.1, i cannot find the mandatory part for evaporative c

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Dec 10, 2014, 3:09 pm

Air Quality Testing after completion

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Mike Stopka  on 

Hello I have a project that is very close to LEED Gold. I am trying to lock down one more point. The project is in the final phase of the construction submission for LEED.

6
Tue Dec 9, 2014, 9:03 pm

Where do I enter residential units in form?

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Maria Porter  on 

My project is a nursing home with some workstations for staff. In the form (v 4.0) on LEED Online there is nowhere to fill out what lighting controls the residents have.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Tue Dec 9, 2014, 9:59 am

Exemption for Labs

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Amit Ahiel  on 

Let me preface my question with some context. I have a client (world famous for their electronic gadgets) who is building a lab for research and development of new gadgets and components.

5
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Dec 8, 2014, 8:41 pm