1-floor renovation in an 2009 EBOM Certified Building
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by John Krutko on
I am proposing on a project in which the scope is the renovation of a single floor of a 10 story building that is currently LEED 2009 EBOM certified.
Energy Modelling - Australia
NC-v4 EAp2:Minimum energy performanceposted by Quentin Jackson on
We have a Green Building Council in Australia that has a very advanced energy simulation methodology that achieves the same outcomes as the ASHRAE 90.1 process outlined in LEED.
>10% exemption possible?
EBOM-2009 MPR2:Must be a complete, permanent building or spaceposted by Rasita Masalskyte on
Hello, Has anyone heard of possibility to exclude >10% of building gross area that is under separate ownership and management? In our case such space makes 14%.
Project size extended in the middle of construction
NC-v4 MPR3:Must comply with project size requirementsposted by wachira sosaeng on
My project registered for LEED 2009, mixed use building with 2 towers on the same podium.
Process Water
Retail-NC-v2009 WEp1:Water use reductionposted by Donald Green on
We have a project where there are a couple pieces of equipment that may be considered Process Water: a mobile pressure washer and a parts washer.
Project size extended in the middle of construction
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by wachira sosaeng on
My project registered for LEED 2009, mixed use building with 2 towers on the same podium.
Demolished and rebuilt envelope
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
If the envelope is demolished and then rebuilt with the same shape does Table G3.1 part 5., baseline, point f apply?
Baseline System 2
NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
As per Table 6.8.1D, I observed the following EER = 12.3-(0.213*Cap/1000) EER Also, Cap means the rated cooling capacity of the product in Btu/hr.
Calibration
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Gustavo De las Heras Izquierdo on
Hallo, According to the BMS and HVAC subcontractor, the sensors do not need to be calibrated, particularly CO sensors and chilled water temperature sensors.
Resources Links not working
NC-2009 SSp1:Construction Activity Pollution Preventionposted by RYAN BEN SABILALA on
I noticed some of the links for the Resources Page are not working anymore. Can anyone do an update? Thank you.