EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by Gustavo De las Heras Izquierdo on
Our project is an office tower with 30 tenants. Does the BAS need to control tenant's systems?
ASHRAE HVAC Apps Handbook Equation, Table 2, and Walls
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Avery Colter on
OK, so a reviewer directed me to the 2011 ASHRAE HVAC Applications Handbook.
Non-direct Purchase Item
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Ran Zhang on
The project I am working for does not pay for any toner cartridges as they are included in the maintenance contract.
Non-direct Purchase Item
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Ran Zhang on
The project I am working on does not pay for any toner cartridges as they are included in the maintenance contract.
LEED CI 2009 _ MR Cr1.1_Tenant Space- Long Term Commitment
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Kusha Dogra Sehgal on
I am currently working on LEED CI 2009 project.
Waste Stream Study: Address top 4 only, or any 4 out of the 5?
Retail-NC-v4 MRp1:Storage and collection of recyclablesposted by Greg Romanczyk on
The credit requirement indicates a waste stream study needs to be conducted to identify the project's top five recyclable waste streams.
ASHRAE HVAC Apps Handbook Equation, Table 2, and Walls
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Avery Colter on
I have a laundry room in a building which has no interior doors to other inhabited interior spaces, only an exterior door and exterior windows.
Tenant submetering
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Gustavo De las Heras Izquierdo on
I’ve read in the Bird’s Eye View Section that “Tenant submetering would not alone qualify for this credit. […]”.
Campus Boundary/Master Site vs Project Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Robin Dukelow on
Hello, I have questions regarding the following:: MPR supplemental Guidance, Revision #2, MPR #3, item 3., states that "LEED projects located on a campus must have project boundaries such that if a
Standing human activity
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by VICTOR MORENO on
Hello, I am working in a Museum project.