Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

SSpc14 Walkable Project Sites - navigating process

Pilot-Credits PC14:Walkable Streets
posted by  Margaret Montgomery  on 

Wow. The credit makes some sense, but the process is definitely a challenge. I just spent 20 minutes trying to find the survey to complete it.

1
Tue Mar 8, 2016, 10:08 pm

LEED CI for Retail - MRp1

Retail-CI-v2009 MRp1:Storage and collection of recyclables
posted by  Gail Napell  on 

does anyone have an example of a waste stream study that meets these requirements? there isn't one in the LEED Reference Guide. thanks all!

1
Wed Aug 30, 2017, 2:23 pm

when we register a pilot credit....

Pilot-Credits EApc65:Monitoring based commissioning
posted by  Gail Napell  on 

we registered the pilot credit; is it supposed to show up in the project in LEEDonline? how do we upload the documentation???? thanks for guidance -

0

Option 3 Guidance Now Available!

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Paula Melton  on 

The actual points won't be achievable for a few months, but USGBC has released implmentation guidance. Please see the details here:

0

FSC Mix 97%, Composed of 100% new wood by weight.

CI-2009 MRc7:Certified Wood
posted by  H. Group  on 

I rec'd a letter from manf. of the door company. It stated the door i ordered is FSC Mix 97%. Composed of 100 new wood by weight, FSC COC Code xxxxx.

1
Tue Dec 29, 2015, 8:05 pm

VT Industries - Wood Veneer Structural Composite Lumber Core Doo

CI-2009 MRc4:Recycled Content
posted by  H. Group  on 

VT sent me a letter stating MR4 & MR5 no assistance available. I called but didn't do me any good. Does anyone know if this door contain any recycled content? thank you

1
Sun Nov 15, 2015, 2:12 pm

Option 1 and Option 2

NC-v4 EQp2:Environmental tobacco smoke control
posted by  Jen Roberts  on 

I just need clarification on something. In the reference guide, it states "Residential only" for Option 1.

1
Sun Nov 15, 2015, 5:43 pm

Which MRT to use

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Jordan Kirrane  on 

Hi, I have the annual hourly mean radiant temperature results (from the energy model simulation). I'm wondering what MRT you have used in the past if you have all of these figures?

1
Tue Dec 1, 2015, 4:24 pm

OA Air Flow Monitoring in Laundry

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Joe Kaminski  on 

The project I am working on has large laundry area with outside air provided for makeup air for the dryer exhaust.

1
Wed Dec 9, 2015, 3:20 pm

Credit Specific requirements and Additional Questions mis-match

Credit Forums
posted by  Carolyn Day  on 

There seems to be a mis-match between the credit description and the requirements.

1
Wed Mar 16, 2016, 2:04 pm