AGMBC: Multiple Building and On-Campus Projects

CS-2009 MPR2:Must be a complete, permanent building or space
posted by  Tam Kin Hung  on 

Project brief: 1. The project is composed of 3 office buildings with retail podium for each of them, 1 residential building also with retail store surrounding it.

0

Precertification in LEED-CS v4

General forums
posted by  Nándor Kovács  on 

Hello, Is there any information available about precertification process in LEED-CS v4?

0

Air Locks and Negative Pressure

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Raina Tilden  on 

The project I am working on consists of a huge machine shop on one side of a glass wall and offices on the other side of the glass wall.

1
Wed Mar 19, 2014, 2:25 pm

Using BD+C SSc4.1 as an EBOM IO credit

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Michael Smithing  on 

We're working on the EBOM certification of a building with excellent public transportation. Has anyone attempted to use SSc4.1 as an IO credit in EBOM?

1
Wed Mar 19, 2014, 3:58 pm

Pilot Credit Closed

Pilot-Credits SSpc7:Light pollution reduction
posted by  Bill Swanson  on 

Pilot Credit Closed This pilot credit is closed to new registrations

1
Wed Mar 19, 2014, 6:35 pm

Purchased Energy Rate

General forums
posted by  May Xu  on 

We are working on a project consisting of several offices and residential buildings, but LEED boundary is considered only one of the office building.

1
Thu Dec 11, 2014, 3:00 pm

greenhouse as a connection to the outdoor

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  FABIO VIERO  on 

We are assessing a two stories office building composed by three main office blocks, each one connected by two greenhouse blocks hosting plants and people as a break area (non regularly occupied ar

1
Thu Mar 20, 2014, 9:09 pm

Not all systems are implemented by the time of occupancy

NC-2009 EAc3:Enhanced Commissioning
posted by  Magda Aghababyan  on 

Dear all, Can you please advise me on a situation where the design states part of the building to be conditioned and the other part is ventilated but by the time occupancy happens the owner has de

1
Tue Mar 25, 2014, 8:03 pm

Group certification with lockers

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Fabien Challeat  on 

I'm working on a factory project, consisting of 7 buildings. Among them, three are lockers buildings (I mean exclusively lockers, without any other spaces).

1
Fri Apr 11, 2014, 8:39 pm

Process refrigerant conversion

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  Jennifer Knocha  on 

We have a walk-in freezer and refrigerator that have CFCs in them. All the references for a conversion or phase-out plan only reference HVAC equipment.

1
Fri Apr 11, 2014, 8:29 pm