Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Bike Racks and project boundary

Retail-NC-v2009 SSc4:Alternative transportation
posted by  Paladino "Team"  on 

In NC-Retail 2009, for SSc4.2, the number of secure bike racks / storage spaces is based on "project square footage". Is this building SF?

1
Fri Apr 11, 2014, 4:05 pm

To fill in credit form table 2

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Catharina B  on 

Hello On our project has been decided to use the total budget method to demonstrate that we achieve this credit. On wall we used ceramic tiles.

1
Fri Feb 21, 2014, 1:43 pm

Naturally Ventilated building - Hot and Humid Zone A1

NC-2009 IEQp1:Minimum IAQ Performance
posted by  LEED Pro Consultant  on 

We are looking to certify a naturally ventilated project NC-v2009 (bus terminal) that is located in a Hot and Humid zone.

1
Fri Feb 21, 2014, 6:21 pm

Group project boundary for two buildings that are separated

LEED Guidance for Campuses and Multiple Buildings
posted by  Kent Liu  on 

Hi all, I am pursing a multiple building submission for 2 NC buildings.

1
Fri Feb 28, 2014, 12:29 pm

Space designation

Schools-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Gabriele E. Bibee  on 

We are working on an elementary school that has several multi-occupant spaces that are being used exclusively by itinerant teachers. Student /teacher sessions are less than 60 min.

1
Fri Mar 7, 2014, 5:22 pm

Urban Spaces

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Farah A.  on 

If urban projects earn Credit 2, Density Development/Community Connectivity in conjunction with 5.1 OR 5.2, will they earn the points of Credit 2 PLUS the points of Credit 5, or is there a certain

1
Mon Feb 24, 2014, 2:38 pm

Existing Tenant - no info

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Melissa Wrolstad  on 

I'm working on a project that will be achieving Building Reuse - 95%. There's a tenant on the first floor that occupied approximately 10% of the entire building.

1
Sat Mar 8, 2014, 3:53 am

Form Releasing Agents VOC Requirements

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Samantha Nourse  on 

I have a subcontractor proposing to use a Form Releasing Agent with a VOC level of 445 g/L. I have yet to find a hard-fast requirement for a VOC max. content for this LEED Credit.

0

SSc5.1 Disturbance Parameter Clarifications

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Hal Marvin  on 

I assume that stormwater drainage pipes and appurtenances count as utilities and will be allowed the 10 or 15 foot disturbance buffer depending on diameter?

1
Mon Feb 24, 2014, 1:34 pm

Zoning Minimum parking requirements

CI-2009 SSc3.3:Alternative Transportation—Parking Availability
posted by  Jessica Miller  on 

My office is moving to a mixed use space so we will be SSc3 case 1, less than 75% of the building.

1
Sat Jul 26, 2014, 5:27 am