Forum quick links
Bike Racks and project boundary
Retail-NC-v2009 SSc4:Alternative transportationposted by Paladino "Team" on
In NC-Retail 2009, for SSc4.2, the number of secure bike racks / storage spaces is based on "project square footage". Is this building SF?
To fill in credit form table 2
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Catharina B on
Hello On our project has been decided to use the total budget method to demonstrate that we achieve this credit. On wall we used ceramic tiles.
Naturally Ventilated building - Hot and Humid Zone A1
NC-2009 IEQp1:Minimum IAQ Performanceposted by LEED Pro Consultant on
We are looking to certify a naturally ventilated project NC-v2009 (bus terminal) that is located in a Hot and Humid zone.
Group project boundary for two buildings that are separated
posted by Kent Liu on
Hi all, I am pursing a multiple building submission for 2 NC buildings.
Space designation
Schools-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Gabriele E. Bibee on
We are working on an elementary school that has several multi-occupant spaces that are being used exclusively by itinerant teachers. Student /teacher sessions are less than 60 min.
Urban Spaces
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Farah A. on
If urban projects earn Credit 2, Density Development/Community Connectivity in conjunction with 5.1 OR 5.2, will they earn the points of Credit 2 PLUS the points of Credit 5, or is there a certain
Existing Tenant - no info
CS-2009 IEQp1:Minimum IAQ Performanceposted by Melissa Wrolstad on
I'm working on a project that will be achieving Building Reuse - 95%. There's a tenant on the first floor that occupied approximately 10% of the entire building.
Form Releasing Agents VOC Requirements
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Samantha Nourse on
I have a subcontractor proposing to use a Form Releasing Agent with a VOC level of 445 g/L. I have yet to find a hard-fast requirement for a VOC max. content for this LEED Credit.
SSc5.1 Disturbance Parameter Clarifications
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Hal Marvin on
I assume that stormwater drainage pipes and appurtenances count as utilities and will be allowed the 10 or 15 foot disturbance buffer depending on diameter?
Zoning Minimum parking requirements
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Jessica Miller on
My office is moving to a mixed use space so we will be SSc3 case 1, less than 75% of the building.