Forum quick links
Baseline of NPDc8
ND-v2009 NPDc8:Transportation demand managementposted by Jie Xiong on
Hi For this credit, it says that create a TDM program for the project to reduce 20% at least weekday peak-period motor vehicle trips compared with a baseline case. So what is the baseline case?
Hopefully A New Direction
posted by Marcus Sheffer on
Very interesting to hear about your new endeavor Jerry. Hopefully GG can become a positive force in the green building market. It certainly has some very positive features.
Exemplary Performance
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Wayne DeFeo on
On the form it notes that for exemplary performance we have to show that we are within 1/2 mile of at least 2 existing commuter rail, etc….and/or within 1/4 mile of at least 2 stops for 4 or more…b
Clarification on SS Credit 5.2
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Emmanuel Gee on
Our project is in a dense urban area and we will meet the guidelines for SS Credit 2.
Higher Expectations
posted by SAULO ROZENDO on
From the various challenges we have in the industry, I am very impressed someone took the task of strategically changing Green Globes. Clearly a case for marketing segmentation.
Eucalyptus - Rapidly Renewable
CI-2009 MRc6:Rapidly Renewable Materialsposted by Vivian Tazima on
Hi, I have a project that uses MDF for furniture manufacturing. Here in Brazil the MDF are 100% virgin materials - derived from the eucalyptus reforestation. There are studies showing that the euca
Pre construction ductwork cleaning
NC-2009 IDc1:Innovation in Designposted by Cynthia Kaplan on
My project is a full renovation of a 1920's high school for use as a new middle school. The owner ordered a full video inspection of the existing ductwork.
Applying the 0.5 gpm limit to toilets embedded in departments
Healthcare-v2009 WEp1:Water use reductionposted by Kim Shinn on
There is a discussion string under the LEED HC 2009 WEc3 credit forum about whether or not faucets in toilet rooms that are embedded in clinical departments (imaging, lab, therapy) should or should
Bicycle Facilities credit - required bike lane width
NC-v4 LTc6:Bicycle facilitiesposted by Michelle Bombeck on
Does anyone have any insight into the on-street bike lane width requirements for this credit?
Interior Renovation
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Jeremy Kuhre on
I'm seeking clarification on how this credit applies to an interior renovation. The existing tenant will actually remain in place during construction.