LEED for Campus Master Site registration
posted by Ludmilla Pavlova-Gillham on
My campus is considering registering our entire campus site (1400+ acres) under LEED for Campus. To whom do I issue the registration fee check - to USGBC or GBCI?
Multi-zone system when single AHU supplying OA to FCUs?
CI-2009 IEQp1:Minimum IAQ Performanceposted by Poorva Keskar on
We have 2 AHUs supplying OA to individual FCUs via a separate duct as per ASHRAE 62 intake requirement. The mixing occurs at the individual FCUs and then supplied to the zone.
Kitchen Sinks
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Amanda Johnson on
Hi, we are working on an office tower EBOM project and one standard review remark concerned the absence of kitchen sinks.
Delineation of systems AND heat sources
NC-2009 EAp2:Minimum Energy Performanceposted by Wes Lawson on
Table G3.1.1A states that buildings that are “…eligible for more than one baseline system type should use the predominant condition to determine the system type for the entire building except as no
Scorecard
NC-2009 PIf1:Minimum Program Requirementsposted by John Riker on
We are trying to finish submitting all our credits, and I can't get the check mark for PI-1 on the scorecard to turn green.
SS2 Landscaping Irrigation and WE2 Irrigation System
posted by Bill Kehres on
How do you get credits for no irrigation? I do not see any automatic points or a way to calculate them.
Re-using shale and theater seating
NC-2009 MRc3:Materials Reuseposted by Michelle Meis on
I am on a project that is installing geothermal. The company that will be drilling the wells is planing on re-using the shale that is removed during the process.
DHW Model Inputs
NC-2009 EAp2:Minimum Energy Performanceposted by Wes Lawson on
All, We are attempting to accurately model the gas energy usage for the DHW system in a recent residential building.
Floor Area
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Simon Sue on
In pursuit of flush out for the project, should "gross floor area" be used or "net occupiable area" for the calculations? The "FAQs for IEQc3.2" section on this page states "all occupied gross floo
Universal Design
Pilot-Credits PC34:Design for Adaptabilityposted by USGBC National Office (in DC) BG+LU FW on
This particular single family home was designed for adaptability by request of the client.