Forum quick links
Return plenums should be used in the baseline model?
NC-2009 EAc1:Optimize Energy Performanceposted by Rosana Correa on
Hello, If in the proposed building there are plenums specified as return air path in the HVAC system, should I use them or ignore them in the baseline model? Thank you,
On-site vs. Off-Site Campus Project
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Eddie Cuevas on
I am working on an EBOM project located on a college campus.
thermal blocks & HVAC zones
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
Hello, I´ve a question about thermal zonification in my energetic model. I use Energy+ and my proposed HVAC system is Geothermal Heat Pump, AHUs for ventilation requeriments, Fan-Coils and Radian
LEED CERT ON PUBLIC PARK / FIELD HOUSE
posted by Mars Dauer on
Hi i am doing a feasibility report on LEED certifying a couple field houses owned by public parks.
Environmental Center serves students.
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Peter Doo on
I am advising an environmental education center that is in a town not served by public transportation. This is not a facility serving the general public on a walk-in basis.
NC-2009 MPR 2 - new distinct building attached to existing
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Kenneth Ruby on
We are designing a new 116,000 SF, 8 story University building to house distinct academic departments.
Rc in split unit system
NC-2009 EAc4:Enhanced Refrigerant Managementposted by ABDALAZIZ ZAQOUT on
I have a split units that their Rc is above 5 mentioned in the Reference Guide, but fortunately my average refrigerant atmospheric impact is lower than 100 (according to use efficient centrifugal c
Counting Entrances for Transit Served Locations
ND-v2009 SLLp1:Smart locationposted by Michael Smithing on
I understand that each entrance to non-residential buildings must be counted separately.
CI vs NC
posted by Dale Dunnet on
Our client has a 100 year old building in the downtown area of a small town.This building will be a total interior demolition (exterior walls/ windows remain).
VAV minimum for Ds
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by George Kotsis on
Hello all, I am completing the 62mzcalc spreadsheet during heating mode. VAV box minimums are typically 30% for systems with reheat.