STC for Ceiling Assembly
Schools-2009 IEQc9:Enhanced Acoustical Performanceposted by PREMNATH SUNDHARAM on
I'm filling out the Table IEQc9-1 and it asks me for a STC rating for the ceiling assembly. I set the space "adjacent to assembly" to "outdoors " because it is only a 1-story building.
Tenant/Owner Do Not Purchase Food for Occupants...So I Did.
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Michelle Bracewell-Musson on
I have wriiten verification the Tenant (State Office) and Owner do not make food purchases (none for tea/coffee either), therefore, I bought my own UDA Certified Organic and had a the LEED Charrett
Separate Buildings, Same Cellar
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Jesus Deras on
I have two hotel projects(190K & 98K) which will be filed as two separate LEED projects that have a combined cellar.
LEED Signage for display inside Gold certified office building
posted by Jeff Zunt on
I'm looking for great examples of sign packages that were developed and displayed in buildings that identify the LEED credits achieved throughout the building and how they were achieved.
LEED Project Boundary in case of uderground parking
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mario Pinoli on
Hello, just a question about LEED Project Boundary.
Feed-in tariffs
CS-2009 EAp2:Minimum Energy Performanceposted by BH . on
Hi, Hi, in EU most countries have feed-in-tarriffs, which reimburse the owner for energy produced at a higher rate than the cost of energy.
Ongoing Cx Requirements
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Colleen Collins on
I have a question regarding EA2.3 As I understand it, it appears that the ongoing Cx process effectively begins with EAc2.1 and EAc2.2.
EA prereq documentation
NC-2009 EAp2:Minimum Energy Performanceposted by Mike Decoster on
We have documented EA prereq 2. We are using LEED NC v 2009 and we are using form version 4. We have filled in all the required information with the exception of the Target Finder.
Mixed Ventilation
NC-2009 IEQc2:Increased Ventilationposted by Paula Hernandez on
Hello Everybody, I have this Project, which main activity is store and move packages.
LEEDUser vs. USGBC
Pilot-Credits PC34:Design for Adaptabilityposted by Nicholas Swinehart on
There are discrepancies between the LEEDUser and USGBC requirements for this pilot credit.