Forum quick links
Calculating FTE- LEED for Healthcare
NC-2009 PIf3:Occupant and Usage Dataposted by Catherine Blakemore on
My project is a surgical suit additions. We are calculating patients as: 1) transients 2) outpatients The only transients for the project are the patients.
Multipurpose Space in Basement Regularly Occupied?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Nelina Loiselle on
Thank you Todd for answering my previous question- Now I have another one.
FSC invoices
NC-2009 MRc7:Certified Woodposted by Teresa Bell on
from the FAQ's: "GBCI had required invoices for all wood products, but has switched to requiring only invoices for FSC certified products, per the April 2008 FSC memo, which states that all invoic
Questions
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Lolita Wu on
Hi all, We are working on a project that uses recycled wastewater and collected rainwater for toilet and urinals.
CxA Experience
NC-2009 EAc3:Enhanced Commissioningposted by Ameet AA on
LEED online template/ form require the following: "Enter information for two projects commissioned by the CxA which are similar in scope and type to this LEED project building" I am working on
Epoxy Finishes
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by shaun Andriano on
I've read through the list of previous comments, but am still a little confused based on the latest template updates.
Sharing the system with toilets
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Mike D on
Can this be achieved if the cleaner's cupboard and the toilets share the same extract system?
All LEED sample forms
posted by Erin Holdenried on
There used to be a very useful page on usgbc.org where you could download zip files of groups of LEED sample forms. It seems to have disappeared with the re-vamping of their website.
Supplementary ventilation for after-hours
CI-2009 IEQp1:Minimum IAQ Performanceposted by Diana Nezamutinova on
Our project has one primary ventilation system for the entire project space served by the base building AHUs.
Campus/District Geothermal Loop
NC-2009 EAc1:Optimize Energy Performanceposted by Aaron Cook on
Is there a guidance document/discussion available on how to treat a campus geothermal loop (servicing several buildings) that provides the working fluid to the LEED project building conditioned wit