NC-2009 EAp2:Minimum Energy Performance
posted by  Erika Duran  on 

I'm modeling a residential building with water to air heat pumps in all apartments.

1
Thu Dec 27, 2012, 9:39 pm

Two building connected by bridge.

General forums
posted by  Zonda E. Team  on 

The project involves two buildings, one is an office+workshop (50,000 sqf) and the second building is Dining area for the first building (7,000 sqf).

0

Occupancy values in ventilation calculations

Calculating FTEs
posted by  Daniel Padgett  on 

Hello, one of our review comments was that the occupancy values we reported in the ventilation calculations were inconsistent with those reported in other credits.

1
Tue Mar 19, 2013, 1:11 pm

LEED EBOM 2009 Performance Period / Fees - Resurrected Project

Performance Period
posted by  Randy Walsh  on 

Breathing new life into a comatose certification application already through preliminary review. Initial performance period 09/09/10 through 12/09/10. Application submitted 04/02/12. Preliminary r

1
Thu Mar 21, 2013, 5:07 pm

Airport FTE Calculation

Calculating FTEs
posted by  MURAT DOĞRU  on 

Is there anybody got Airport FTE calculation ? It can be good base for us.

1
Thu Mar 21, 2013, 5:25 pm

What is the LEED recommended teperatue for a

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Mahbuba Khan AIA, LEED AP BD+C  on 

I am working on a mechanically ventilated manufacturing building in Bangladesh. What is the maximum acceptable temperature for this kind of building?

1
Mon Dec 31, 2012, 3:56 pm

Calculating Views for Healthcare Interiors Projects?

Healthcare-v2009 IEQc8.2:Daylight and views - views
posted by  Kathy Wislocky  on 

Has anyone contemplated an alternate compliance path for calculating views for a healthcare interiors project?

1
Wed Jan 2, 2013, 3:37 pm

Document review

Schools-2009 EAc3:Enhanced Commissioning
posted by  Adam Rustige  on 

Is reviewing I&O manuals and as-built drawings a requirement for enhanced commissioning? Thanks

1
Mon Jan 7, 2013, 3:12 pm

Missing requirement on Pilot Form?

Pilot-Credits MRpc53:Responsible sourcing of raw materials
posted by  Brian Leet  on 

When I go to the current version of the pilot credit form at http://www.usgbc.org/ShowFile.aspx?DocumentID=10106 there is no actual Material Source Disclosure language within the credit itself.

0

Proposed Vs Baseline

NC-2009 EAp2:Minimum Energy Performance
posted by  PAWAN DAHIWAL  on 

My proposed case VAV does not have parallel fan power boxes.

1
Wed Jan 2, 2013, 3:48 pm