Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Vegetated roof

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  Katherine Ann Resurreccion  on 

If the project team plans to install vegetated roof, can they earn both credits (SSc5 and SSc7.2) provided the installation meets the required area for landscaping?

1
Tue Feb 19, 2013, 7:20 pm

ASHRAE mandatory provision 5.4

CS-2009 EAp2:Minimum Energy Performance
posted by  Sandra Holmström  on 

Requirements according to ASHRAE mandatory provision 5.4: Cargo doors and loading dock doors shall be equipped with weather seals to restrict infiltration when vehicles are parked to doorway.

1
Tue Sep 11, 2012, 1:37 pm

Tenant Lease Agreement Cases:

CS-2009 WEc3:Water Use Reduction
posted by  Diego Escalona  on 

Is possible, for a LEED CS project to apply for the three cases (A, B y C), that are expressed in the appendix 4: Tenant Lease Agreement. I.e.

1
Sun Nov 25, 2012, 12:40 am

Comingled Recycling

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Nate Ritter  on 

If a waste hauler servicing a building is offering comingled recycling off all office waste, including waste items that are non recyclable would the storage space on site still be required.

1
Tue Sep 11, 2012, 4:33 pm

Non-Regularly Occupied Spaces such as Bathrooms and Corridors

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  American University  on 

Unfortunately, I believe bathrooms and corridors have to be included in the IEQc2.2 calculations.

1
Tue Sep 11, 2012, 7:04 pm

HVAC System Type for Cold Storage Room

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Dear Forum, I have the following issue: For the Certification of a Restaurant, there is an inside area that corresponds to cold storage rooms.

1
Wed Sep 12, 2012, 1:43 pm

Ventilation Openings

CS-2009 IEQp1:Minimum IAQ Performance
posted by  TOMAS URIBE  on 

Hello. We are working on a Core & Shell project, it has retail spaces that consists of two levels each one.

1
Wed Sep 12, 2012, 1:23 am

Default or maximal fixture uses ? flow restrictors ?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Nicolas MOLLE  on 

Hello, I have two questions about this prerequisite: 1st. Are the flow described in the baseline a maximum flow for the project ?

1
Wed Sep 12, 2012, 12:07 pm

Building for a single tenant but with laboratories and offices

LEED Rating System Selection
posted by  Nicolas MOLLE  on 

Hello, We are going to register a project for ALSTOM which contains: Offices, laboratories, restaurant and workshop in a whole building of nearly 30 000 m².

1
Wed Sep 12, 2012, 10:22 am

Showers for SSc4.2

CS-2009 WEp1:Water Use Reduction
posted by  BH .  on 

Hi, I have doubts regarding showers for bicycle racks calculations for WEp1.

1
Wed Sep 12, 2012, 3:53 pm