Forum quick links
Exterior Illuminated Signage
EBOM-v4 MRc2:Purchasing - lampsposted by Kristina K on
Hello,
Does this credit apply to Exterior Illuminated Signage?
Thank you
Total Material Cost
posted by Arda Buyuklu on
Why is providing Total Material Cost required/necessary when completing a LEED v4.1 Materials Reporting Form?
Multi-building project - installing renewables on only 1 building
CS-v4 EAc5:Renewable energy productionposted by Shannon Oletic on
We have a multi industrial building project (3 buildings) registered through a Campus Approach (as opposed to Group approach).
Is It Uploaded Yet? Project Process webinar recording now available!
posted by Amanda Farman on
Hi all,
PC MRpc87 Feedback
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Dan Ackerstein on
Feedback from the architecture firm and general contractors re: PC implementation in Southern California
WEp1_manual watering
NC-v4 WEp1:Outdoor water use reductionposted by Alex Edwards on
Hi, we have a project for NC, they plan to use manual watering system for the landscape outside the house (they have water dispensers available, the staff will discharge into the bucket and water m
"7% for green vehicles "
NC-v4 LTc8:Green vehiclesposted by Santiago Avila on
"LT Credit Reduced Parking Footprint.
No More Strigent Than
NC-v4 EQp2:Environmental tobacco smoke controlposted by Hannah Fleck on
Hello, I am working on a publicly funded building in the state of Indiana. State law here prohibits smoking within 8 feet of a building.
Peak Shaving Strategies
NC-v4 EAp2:Minimum energy performanceposted by Dave Hubka on
The energy used by electric vehichle charging stations within the LEED Project Boundary is not included within the eneryg model.
LEED point adjustment when ASHRAE 90.1-2019 is used as baseline
NC-v4.1 EAp2:Minimum Energy Performanceposted by elvin ruya on
Is there a direct correlation for LEED points when ASHRAE 90.1-2019 baseline is used instead of 2016?