Forum quick links
Residential, Option 3
posted by Erin Nuckols on
spaces,zones and systems in the energy model
NC-2009 EAp2:Minimum Energy Performanceposted by Tarek Dalati on
do the spaces,zones and air systems in the baseline should have the same names as in the proposed design and the ones in the upploaded drawings? in the mechanical equipments schedules the engineer
electrical room/swimming pools cooling
NC-2009 EAp2:Minimum Energy Performanceposted by Tarek Dalati on
is the electrical rooms and internal swimming pools cooling is considered as a process load or not? and what leed reviewer should see in the energy model output. regards
How do we show compliance with CEN standards in IEQp1?
posted by Maria Porter on
In order to show compliance with CEN standard for IEQp1, what exactly do I upload?
Building Area Method applicable for Multi-use-building
CS-2009 EAp2:Minimum Energy Performanceposted by Marco Abdallah on
Assuming a 10 storey building where the first three floors are retail floors and the remaining 7 floors are office floors, is it generally possible to use the building area method? Is it possible t
LEED Online, Reference Guides, User Friendly Documentation
posted by Michelle Teague on
LEED Users, what are your thoughts and experiences with LEED Documentation?
Commissioning has changed more than is being discussed...
posted by Scott Bowman on
I do not fully agree with Nadav’s analysis above that Envelope Cx was moved to the credit.
Energy Modeling Technical Questions and Answers
posted by Scott Bowman on
Energy modeling and its review is a very complex and detailed endeavor on both sides. It would be good if there could be more than one round of review, comment, address, finalize.
Roof Garden over existing building
NC-2009 WEc1:Water Efficient Landscapingposted by Julie Blue on
WE have a roof garden that is irrigated over and existing building that is not part of the LEED certification. We are defining a LEED boundary for our 2009-NC project.