Forum quick links
Sunset date and timelines
posted by suveera kakkar on
Hello
SCL Water Sub-Group
posted by Patty Lloyd on
The Water Sub-Group met today. This group is working on three items:
1. Project Water Plan Template
2. Project Water Tracking Form Template
SCL Summit - Waste Subgroup Follow Up Call - Construction Waste Management
posted by Ali Flynn on
Hi all,
Energy modeling, Chiller at AHRI conditions
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Sánchez Sánchez on
Hi,
I’m modeling a building which has water-cooled chillers.
Submitting evidence in design or post-construction stage
NC-v4 EQc9:Acoustic performanceposted by Greenlab on
Hi,
We are in the process of replying to a LEED Certification Review – split review, design stage – of a building which is now close to completion.
Energy Model Room category for server room relevant in baseline building
NC-v4 EAc2:Optimize energy performanceposted by Benjamin Weise on
We're modelling an office building (space by space method) with a relatively big server room (50kW).
Functions of the same product
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Hashir Usman on
Hi all,
Clarification Re. General Emissions Requirement for Multi-part Acoustical Wall Treatment
NC-v4 EQc2:Low emitting materialsposted by Vanessa Nelson on
We have a project with sound recording studios with drywall throughout and an acoustical wall treatment that will be assembled on site and attached to select portions of the drywall.
Industry-Wide EPD - error in description?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Megan White on
Hi all, In the ref guide (p.514), it states that as part of Industry Wide EPD "the manufacturer is explicitly recognized as a participant by the program operator." However, this is the same exact