Forum quick links
Materials Considered
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Angela Saggin on
Hi! I've just started studying this credit and me and my colleagues were arguing about what materials exactly we should consider to achieve this credit. "Requirements" says that we should use arc
Tristan is awesome.
posted by Susan Walter on
I'll play along. But while this is just the two of us, I'm going to underbid you. My guess is 23,975.
User group for an added separate ADA restroom
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Susann Geithner on
Our project is the remodeling of an office space with existing restrooms, which will be equipped with new fixtures and we had to add a restroom with one toilet for ADA compliance.
Energy Model
CS-2009 EAc1:Optimize Energy Performanceposted by Oliver Preuss Hernandez on
Hi, I am about to start to model a Building which includes a Ventilated Facade. But I don't have any idea how to represent it on the simulation program.
Template link to Tier III pesticides not sufficient
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Geoffrey Tomlinson on
FYI, We were just denied the IPM credit using the LEEDuser template because it only included a link to the City of San Francisco’s Hazard Tier 3 least-toxic pesticides.
Parking Capacity
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by VITAL DAFNE on
I am working on a hotel with two separate buildings. Since the parking will be used for the same hotel, the local zoning requirements were met.
Energy Performance after LEED Award
NC-2009 EAp2:Minimum Energy Performanceposted by Steven Er on
In MPR, all LEED certified project must commit to sharing with USGBC and/or GBCI all available actual whole-project energy data for a period of a least 5 year. I assume building energy performance
Rapidly Renewable Lubricants
NC-2009 MRc6:Rapidly Renewable Materialsposted by Mike Woodfall on
How does a supplier of elevator hydraulic fluids document and communicate the renewable nature of our products to contractors interested in NC2009 MRc6 credits?