Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

ASHRAE 90.1 Exit signs - Mandatory Provisions

CS-2009 EAp2:Minimum Energy Performance
posted by  Bernadette Stauder-Buschlinger  on 

In the CS- project the exit signs are considered to be a part of the emergency lighting. Therefore the lamps are off during normal operation. The proposed exit sign exceed 5 W per face.

8
Bilfinger Baugesellschaft m.b.H.
LEEDuser Basic Member
2 thumbs up
Sat Jul 28, 2012, 7:03 am

Example of Thermal Calculation ?

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Eric JS   on 

Dear all, Do you have any example of thermal comfort calculation to satisfy this credit? Thanks and cheers!

3
Default Avatar
Principal
New England Engineering, Inc.
LEEDuser Basic Member
2 thumbs up
Fri Jul 27, 2012, 8:41 pm

Need details for each room?

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Maura Adams  on 

The review team said we need to highlight and more specifically document the compliance measures for chemical usage areas.

2
Fri Jul 27, 2012, 6:54 pm

suggestions

General forums
posted by  Bill Swanson  on 

1) Do the same process and claim the projects back. I wonder how many times it can change back and forth before someone at GBCI would notice.

5
Fri Jul 27, 2012, 4:41 pm

LEED Project Boundary Changes

General forums
posted by  Daniela Castro Salgado  on 

We have a project for which we are about to submitt precertification documentation. There were changes to the original project boundary because the street will be widened.

7
Fri Jul 27, 2012, 1:49 pm

Groups in shower facility - multiple bldgs

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Marcio Alberto Casado Pereira  on 

We have a factory of 4 buldings. All the FTEs/users from all buildings will be using the shower facilities of one of the buildings - bldg "P10".

4
Fri Jul 27, 2012, 10:22 am

Contaminants of Concern & Green Globes

General forums
posted by  John Chyz  on 

As a certified Green Globes Assessor, I could not help but take issue with the comment that Green Globes has "stronger ties to mainstream industries and lobbyists".

3
Commissioning Authority
The Cross Creek Initiative, Inc.
LEEDuser Basic Member
11 thumbs up
Fri Jul 27, 2012, 3:01 am

Occupancy sensors: valid lighting control?

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Amanda Redmond-Neal  on 

I have an individually occupied "office" (kind of like a coat-check, really) that for some reason was built with only an occupancy sensor and no wall switch.

6
President
Sage Building Revival
LEEDuser Premium Member
113 thumbs up
Fri Jul 27, 2012, 12:39 am
3
Thu Jul 26, 2012, 2:28 pm

FTE Hotel Calculations

Calculating FTEs
posted by  Steven Rowland  on 

Hi folks, I have a hotel project and we are unsure of our FTE numbers. I'm hoping for a little guidance from the community: Hotel has 99 rooms, estimated occupancy percentage is 65% year round.

4
Chief Engineer
Lile Engineering, LLC
LEEDuser Basic Member
59 thumbs up
Thu Jul 26, 2012, 10:37 am