Forum quick links
ASHRAE 90.1 Exit signs - Mandatory Provisions
CS-2009 EAp2:Minimum Energy Performanceposted by Bernadette Stauder-Buschlinger on
In the CS- project the exit signs are considered to be a part of the emergency lighting. Therefore the lamps are off during normal operation. The proposed exit sign exceed 5 W per face.
Example of Thermal Calculation ?
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Eric JS on
Dear all, Do you have any example of thermal comfort calculation to satisfy this credit? Thanks and cheers!
Need details for each room?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maura Adams on
The review team said we need to highlight and more specifically document the compliance measures for chemical usage areas.
suggestions
posted by Bill Swanson on
1) Do the same process and claim the projects back. I wonder how many times it can change back and forth before someone at GBCI would notice.
LEED Project Boundary Changes
posted by Daniela Castro Salgado on
We have a project for which we are about to submitt precertification documentation. There were changes to the original project boundary because the street will be widened.
Groups in shower facility - multiple bldgs
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marcio Alberto Casado Pereira on
We have a factory of 4 buldings. All the FTEs/users from all buildings will be using the shower facilities of one of the buildings - bldg "P10".
Contaminants of Concern & Green Globes
posted by John Chyz on
As a certified Green Globes Assessor, I could not help but take issue with the comment that Green Globes has "stronger ties to mainstream industries and lobbyists".
Occupancy sensors: valid lighting control?
CI-2009 IEQc6.1:Controllability of Systems—Lightingposted by Amanda Redmond-Neal on
I have an individually occupied "office" (kind of like a coat-check, really) that for some reason was built with only an occupancy sensor and no wall switch.
FTE Hotel Calculations
posted by Steven Rowland on
Hi folks, I have a hotel project and we are unsure of our FTE numbers. I'm hoping for a little guidance from the community: Hotel has 99 rooms, estimated occupancy percentage is 65% year round.