Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Comfort Survey

Performance Period
posted by  Jennifer Knocha  on 

We have been asked if it is possible to conduct an additional comfort survey and submit the results, even though we have already completed the initial submission and gotten our first set of review

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Apr 23, 2013, 2:03 pm

Question

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Redy Truccolo  on 

Hi Everybody, I'm doing a CS 2009 Pre Certification and I've already achieved the 50% reduction for the WEc2 Innovative Wastewater technologies. My question is, if I apply for this Pilot Credit (w

4
Sustainability Project Manager
Atkins
LEEDuser Basic Member
59 thumbs up
Tue Apr 23, 2013, 10:08 am

Double skin facade model

NC-2009 EAp2:Minimum Energy Performance
posted by  Florent Fabre  on 

Hi all, I’m working on a LEED certification on an office building with a double skin facade.

3
Tue Apr 23, 2013, 6:38 am

Required Number of Trips

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Caroline O'Leary  on 

I've been attempting to discover the number of times, or if there is a minimum number, that a bus must serve the stop in a day to count for this credit.

7
Mon Apr 22, 2013, 10:44 pm

LEED Interpretation Rulings-When can they be followed?

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Judy Landwehr  on 

Which of the below statements applies to a LEED Interpretation Ruling. The below statements appear to conflict with each other.

8
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 22, 2013, 8:00 pm

Comprehensive Transportation Management Plans

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Eric Shamp  on 

In the LEED 2009 BD&C Reference Guide, there is language in each of the SSc4 credits sections that indicates that a Comprehensive Transportation Management Plan (CTMP) can earn the project one

5
Mon Apr 22, 2013, 7:48 pm

LEV/FEV parking space allotment in a campus setting

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Laura Charlier  on 

We are involved with a project that consists of two new student housing facilities on a college campus.

4
Mon Apr 22, 2013, 2:57 pm

Alternative for ESC plan in hot climate zones (Outside the US)

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Eyad Haj Husein  on 

We're applying for LEED for New Construction in Doha, Qatar. The question is: where can I find information about the alternative of ESC plan?

3
Conserve Green Building and MEP Solutions WLL
LEEDuser Basic Member
3 thumbs up
Mon Apr 22, 2013, 1:59 pm

Rated Power for an Ice Machine

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  William Weaver  on 

We have a number of ice machines on our project that are Energy Star certified.

2
Sat Apr 20, 2013, 2:25 am

Energy Star Equipment Eligibility

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Michelle Rosenberger  on 

As we all know, our Energy Star requirement is based on the eligibility of the equipment for rating and that eligibility is defined by Energy Star not by the USGBC.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat Apr 20, 2013, 2:10 am