Forum quick links
Performance period for leakage rate
EBOM-2009 EAc5:Enhanced Refrigerant Managementposted by American University on
I'm wondering what performance period would be acceptable for calculating the leakage rate (lbs of refrigerant added and over what time frame) for this credit.
Design and Construction credits
posted by Osama Hassan on
Please, I'd like to know the design credits and prerequisites for Healthcare v 2009. Thanks
Future HVAC Installation
CS-2009 EAp3:Fundamental Refrigerant Managementposted by Curt Pascoe on
What if your CS building scope does not include HVAC equipment (and therefore no refrigerants)? USGBC requires the entire building to meet this prereq (including tenant spaces).
Best strategy for an existing campus
posted by K A on
An existing campus with no LEED certified buildings, no similar buildings except the dorms. What would be the best strategy: certify a group of buildings first then pursue a campus master site.
MPR 6
CI-2009 EAc3:Measurement and Verificationposted by Adrienn Gelesz on
I have tried to figure out but cannot wrap my head around another subject. MPR 6 requires sharing actual whole-project energy and water usage data for a period of at least 5 years.
Rainwater Management in Colorado
EBOM-v4 SSc2:Rainwater managementposted by Jonathan Miller on
Does anyone know what the rules are on engaging in rainwater management in Colorado? I'm under the impression that this is against the law in the state.
Can´t access to leed online with my valid USGBC account
posted by Felipe Duran on
Dear All, I am triyng to sign in to leed online with my valid USGBC account name and password and the web page tells me "invalid password or email" Does anybody knows what could be happening? Man
Exterior covered spaces
NC-2009 PIf2:Project Summary Detailsposted by Esmeralda Ward on
Hello, Could someone please clarify where exterior hardscape spaces that are covered by the building roof should be counted?
Multiple Building College dorm project with dining
posted by Todd Bundren on
So I have a multiple building project with 2 resident halls and a dining facility. During the school year (approx.