Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Bike Racks for the Existing Building?

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Greengrade User  on 

Hello all, We have a project that is attached to an existing facility at a University.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 25, 2014, 11:16 pm

Portland Cement

NC-2009 MRc5:Regional Materials
posted by  Rezkar Abdulmajeed  on 

Hi, There is two methods of transport for the Cement I use for concrete in my project; It is coming by water to the port from an approximate distance of 2100 Km and then shipped by truck for 148

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 25, 2014, 2:28 pm

How to handle private elevators into residences

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Heather Appell  on 

We are working on a few high-end/high rise residential projects that are designed to have elevators open into the private residences.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 25, 2014, 1:34 pm

Site Boundary, SWPPP and Erosion Control

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Sandra Ehle  on 

My firm has built an Athletic Field house for a local school district. SWPPP and ESC plans were created and followed accordingly. Now here is where it gets complicated.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri Jul 25, 2014, 12:32 pm

Coastal Coral Reef

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Donald Green  on 

We have an international client with a large campus along a coast line that is forming a landbank to protect existing mangrove areas.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jul 25, 2014, 10:44 am

Discomfort hours - system 4

NC-2009 EAp2:Minimum Energy Performance
posted by  Isabel Santos  on 

Dear all, my building is a warehouse with 3 office areas that, for now, have no hvac system.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jul 24, 2014, 6:50 pm

Existing Renovated Square Footage

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Laura Long  on 

We have a project where we are using the existing footprint of a building without adding any additional square footage to the existing footprint except for cladding existing walls with a new skin.

3
Default Avatar
Sr. Designer, Sustainability and Sr. Associate
NORR
LEEDuser Premium Member
22 thumbs up
Thu Jul 24, 2014, 6:37 pm

LED Lamps - efficiency of mercury containing counterparts?

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Helen Samuel  on 

"Mercury-free lamps, such as LEDs, can be included in the picogram per lumen-hour calculations only if they have efficiency levels that are equal to or greater than those of comparable mercury-cont

3
Default Avatar
Sustainability Consultant, LEED AP
EY
LEEDuser Basic Member
0 thumbs up
Thu Jul 24, 2014, 4:54 pm

Who provides for the submeters?

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Michael E. Edmonds-Bauer  on 

We have a project that will not provide submetters for future tenants however the BMS system will be ready for future tenants to provide their own submetter in order to measure electricity consumpt

5
Thu Jul 24, 2014, 4:40 pm
2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Jul 24, 2014, 1:42 pm