Forum quick links
One or two separate buildings
NC-2009 PIf1:Minimum Program Requirementsposted by Felipe Holguin on
I have a project with two buildings that are attached physically by two underground levels with services as parking spaces, bicycle racks, showers and bathrooms and MEP systems shared for both bu
External Lightning Exceptions
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi everyone, It is necessary to prove the power density in external illuminations with the following characteristics: - Accent lighting (lighting focused on plants and trees) - Lighting for vi
Baseline systems - heating only
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
The project I'm working on currently is for a production plant and office zones all in one building.
Conventional and metering faucets
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Noriko Nagazumi on
Our project has conventional faucets and metering faucets on the same floor. Each of these faucets have different defined baselines.
Equipment Capacity for Design and Baseline Case
NC-2009 EAp2:Minimum Energy Performanceposted by April Brown on
Hi Marcus et al., I received a question from one of our project energy modelers that I cannot answer - Recently we have been receiving a new comment on EAp2 that states “The HVAC equipment cap
Re-applying for a credit approved in Design submittal
posted by Shivani Langer on
At the time when we were submitting our design submittal, the elementary school project was only going to be able to get 7% of its energy offseted with renewables.
Time Setpoint No Met & Setback Temperatures
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi everyone! I've some doubts about this points. Whats is the setback temperatures? The time setpoint not met is calculated only in the occupied hours?
Medical gas system - part of fundamental commissioning?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Veronika Sundberg on
Hello, my qeustion is regarding our medical gas system and if it should be part of the fundamental commissionig for LEED? We will undertake commissioning of the system but would prefer to excluded
Do we need to Commission these systems?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Maya Karkour on
Dear Sirs, I just want to double check if we need to commission, as part of the LEED PRerequisite / Credit, the following systems: 1) Pumps for water distribution, irrigation, sewage, and fuel 2)
INSULATION ON SHELTERED WALLS
CS-2009 EAp2:Minimum Energy Performanceposted by Ana Paula Quiros on
We are assessing a C&S 2009 project. We have two sheltered walls with neighbors on both sides. The walls from the neighbors are not along all the project walls.