Relocated / Occupant owned task lighting

CI-2009 EAp2:Minimum Energy Performance
posted by  Michael Smithing  on 

Our project does not include task lighting; however several users have brought existing task lighting with them from the previous premises to the new premises.

4
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Thu Oct 15, 2015, 8:11 pm
5
Principal
C2 Sustainability LLC
LEEDuser Basic Member
4 thumbs up
Thu Oct 15, 2015, 6:42 pm

Previously developed land must comply with 100-year flood?

NC-2009 SSc1:Site Selection
posted by  Ricardo Sá  on 

The latest version of the LEED template for this credit (v5.0) has a change regarding how the compliance is demonstrated when the projects are outside U.S.

2
Sustainable Building Consultant
Green Bridge Consulting
LEEDuser Expert
28 thumbs up
Wed Oct 14, 2015, 6:35 am

Power over Ethernet (PoE) telephones.

CI-2009 EAp2:Minimum Energy Performance
posted by  Olga Yuil  on 

Power over Ethernet (PoE) telephones: Are they required to be included within EAp2 equipment? Any advice and suggestions will be greatly appreciated.

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Wed Oct 14, 2015, 5:49 am

Does it have to be a Permanent Sign?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Susan Coy  on 

I have a project that the owners want to use stand with the "No Smoking Sign" instead of placing signage on building itself, will that comply?

4
Sustainability Director
Lake|Flato Architects
LEEDuser Basic Member
78 thumbs up
Tue Oct 13, 2015, 12:06 am

Process load

NC-2009 EAp2:Minimum Energy Performance
posted by  Sasha Peters  on 

Can someone please tell what all components must be included in calculating the process load for any building? Can we include basement ventilation, electrical heating water system etc.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Mon Oct 12, 2015, 6:53 pm

Innovation Award

General forums
posted by  Neil Rosen  on 

Tristan, First and foremost I would like to commend you on this concept, obtaining recognition from your peers is a wonderful catalyst for maintaining the creative edge. So here's a solution I thi

3
Director of Sustainability
Northwell Health
LEEDuser Basic Member
48 thumbs up
Mon Oct 12, 2015, 6:16 pm

SSc2 Development Density and Community Connectivity

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Greg Snow  on 

My project is located in a hospital campus and I am targeting this credit for 5 points; 3 for community connectivity and 2 for development density.

3
Default Avatar
Gibbons Snow Architects Inc.
LEEDuser Basic Member
0 thumbs up
Mon Oct 12, 2015, 4:14 pm

Target Index

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  Charalampos Giannikopoulos  on 

Further to a preliminary review of project located outside the U.S.

3
Mon Oct 12, 2015, 2:23 pm

IEQc5 Walk-off mats and low volume printers clarification needed

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Deborah Locklair  on 

We have a mixed use building major renovation on a Government site. There are shops and maintenance areas, some that have unique exhaust systems. Our designer has addressed these requirements.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Fri Oct 9, 2015, 6:23 pm