CHP - Approach
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, I have a project with a CHP and I am unsure how to model in line with requirements. It is to be constructed as part of the current project and will be in the LEED boundary.
Finishing coating on steel surface
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Indochine Engineering VN on
Hi, my project plans to use 2 coating layers for steel frame structure of façade system, onsite and indoor.
CO2 measurements
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Gustavo De las Heras Izquierdo on
Hallo, In our project there are AHUs providing a mix of outdoor and return air.
Applicable spec divisions for MRc3
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Chris Sanders on
Using CSI divisions as a basis, does MRc3 only apply to Div. 03-10, and parts of Div. 31-32? I can't seem to find direction, although I'm sure it exists! Thanks in advance for your help.
Low-Emitting Materials: Flooring IEQ c4.3
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Rezkar Abdulmajeed on
The requirements of this Credit exempts any mineral based finishes from Floor score certification such as tile, terrazzo, marble..... Can someone direct me if the Ceramic tile is included in this e
Combination of New Build and Existing
NC-2009 EAp2:Minimum Energy Performanceposted by Jordan Kirrane on
Hello, I am working on the major renovation of an existing office building and new construction of a new entrance/reception atrium.
exemplary performance points - combined on-site and off-site ren
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Pablo Fortunato Suarez on
Our project has combined off-site and on-site renewable energy sources. The total threshold is over 98%.
Plumbing Commissioning Scope Of Work
NC-v4 EAp1:Fundamental commissioning and verificationposted by Dan Forino on
In LEED 4.0 it states that for plumbing all Domestic Hot Water Systems, pumps and controls.
Estimated Completion Date vs. IEQ testing
NC-2009 PIf4:Schedule and Overview Documentsposted by Greengrade User on
I recall the form saying "estimated" completion date. What can you get away with with "estimated"?