Log in
Forum » Credit Forums
Topic

Roof with solar panels

EBOM-2009 SSc7.2: Heat island effect - roof
posted by Matthew Perna on Dec 30, 2010, 9:08 am

Does anyone know why a roof covered with solar panels wouldn't apply to credit 7.2: Heat Island Reduction--Roof? The USGBC allows it to be used toward credit 7.1 where a roof with solar panels...

Last reply: David Posada, Mar 24, 2011, 12:41 pm

Guadua

NC-2009 MRc6: Rapidly Renewable Materials
posted by Carlos Alberto Hoyos Soto on Mar 24, 2011, 10:23 am

I want to know if anyone has use guadua, and if it is considered as rapidly renewable material, thanks.

Last reply: Tristan Roberts, Mar 24, 2011, 11:30 am

Innovative water efficiency

EBOM-2009 IOc1: Innovation in Operations
posted by Melissa Merryweather on Mar 24, 2011, 12:00 am

A project considering LEED...

Last reply: David Hubka, Mar 24, 2011, 7:58 am

Two fan systems on a common supply riser

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Dave Munn on Dec 4, 2009, 2:30 pm

We are working on a building with a supply fan both at the top of a common supply duct riser (penthouse) and another supply fan in the lower level connected to the base of the common riser. Both...

Last reply: Jalal Avades, Mar 24, 2011, 1:47 am

Multiple AHUs serving a single space

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Zachary Goodnough on Feb 23, 2011, 1:47 am

The building I am working on has a large main sales area which is served by 8 AHUs, all bringing in 100% fresh air. In this case, is the proper protocol to first divide total peak customer and...

Last reply: Zachary Goodnough, Mar 23, 2011, 11:07 pm

EAp2 Equipment Motors

CI-2009 EAp2: Minimum Energy Performance
posted by Eric Claycamp on Mar 22, 2011, 11:23 am

For a LEED CI project that includes a fitness center, do you count the motors in the treadmills and cross trainers? No fitness equipment I have found is Energy Star rated. These loads can be...

Last reply: David Hubka, Mar 23, 2011, 5:09 pm

EAc1 required 2 points

CI-2009 EAp2: Minimum Energy Performance
posted by Jennifer Berthelot-Jelovic on Mar 22, 2011, 3:41 pm

I know that for EAc1 there was a requirement that "All LEED for New Construction project registered after June 26, 2007 are required to achieve at least two (2) points." Since I am working on a...

Last reply: David Hubka, Mar 23, 2011, 5:05 pm

Design Engineer Signatory

CI-2009 EAp2: Minimum Energy Performance
posted by Sundararaj Subburaman on Mar 23, 2011, 3:11 am

Please let me know if the HVAC Designer will be representing the Design Engineer Signatory for the EA P2? If not who will be the Design Engineer - MEP designer?

Last reply: David Hubka, Mar 23, 2011, 5:00 pm

Credit 3.2, Option 1, Path 2

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Douglas Blakeslee on Mar 21, 2011, 4:35 pm

We are the...

Last reply: David Hubka, Mar 23, 2011, 10:02 am

Hotel with a Conference Center and EnergyStar

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Jalal Avades on Nov 11, 2010, 6:07 pm

My project(s) is a Hotel Building with an adjacent Conference Center those are connected by a Tunnel.

The Central Plant which house the chillers, heating hot water boilers, domestic hot...

Last reply: Jalal Avades, Mar 22, 2011, 2:15 pm