CHP - Approach

NC-2009 EAp2:Minimum Energy Performance
posted by  Victoria Watson  on 

Hi, I have a project with a CHP and I am unsure how to model in line with requirements. It is to be constructed as part of the current project and will be in the LEED boundary.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Oct 31, 2016, 7:51 pm

Finishing coating on steel surface

CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Indochine Engineering VN  on 

Hi, my project plans to use 2 coating layers for steel frame structure of façade system, onsite and indoor.

5
Fri Oct 28, 2016, 3:55 pm

CO2 measurements

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, In our project there are AHUs providing a mix of outdoor and return air.

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Thu Oct 27, 2016, 6:27 pm

Applicable spec divisions for MRc3

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Chris Sanders  on 

Using CSI divisions as a basis, does MRc3 only apply to Div. 03-10, and parts of Div. 31-32? I can't seem to find direction, although I'm sure it exists! Thanks in advance for your help.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Oct 27, 2016, 2:36 pm

Low-Emitting Materials: Flooring IEQ c4.3

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Rezkar Abdulmajeed  on 

The requirements of this Credit exempts any mineral based finishes from Floor score certification such as tile, terrazzo, marble..... Can someone direct me if the Ceramic tile is included in this e

2
Mon Oct 24, 2016, 10:57 pm

Combination of New Build and Existing

NC-2009 EAp2:Minimum Energy Performance
posted by  Jordan Kirrane  on 

Hello, I am working on the major renovation of an existing office building and new construction of a new entrance/reception atrium.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Oct 24, 2016, 9:48 am

exemplary performance points - combined on-site and off-site ren

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Pablo Fortunato Suarez  on 

Our project has combined off-site and on-site renewable energy sources. The total threshold is over 98%.

4
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Mon Oct 24, 2016, 4:19 am

Plumbing Commissioning Scope Of Work

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Dan Forino  on 

In LEED 4.0 it states that for plumbing all Domestic Hot Water Systems, pumps and controls.

4
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Fri Oct 21, 2016, 5:50 pm

contact GBCI

posted by  Tristan Roberts  on 
2
Thu Oct 20, 2016, 9:46 pm

Estimated Completion Date vs. IEQ testing

NC-2009 PIf4:Schedule and Overview Documents
posted by  Greengrade User  on 

I recall the form saying "estimated" completion date. What can you get away with with "estimated"?

5
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Wed Oct 19, 2016, 10:24 pm