Storage Rooms as Critical Zone using 62MZ SpreadsheetNC-2009 IEQp1: Minimum indoor air quality performanceposted by James Keohane on May 2, 2011, 6:01 pm
I have received review comments from a LEED Review Team questioning the results of the 62MZ spreadsheet which identified a Storage Room as the "Critical Zone". The reviewer requests that I revise... Last reply: Roger Chang, May 26, 2011, 9:30 am |
|
Direct Exhaust SystemsNC-2009 IEQc3.1: Construction IAQ management plan - during constructionposted by Erik Ruoff on Jul 7, 2010, 9:21 am
Does a project where all exhaust air is exhausted directly to the outside need... Last reply: Tristan Roberts, May 26, 2011, 7:38 am |
|
green power- purchased percentageCI-2009 EAc4: Green Powerposted by Andy Plogsted on May 16, 2011, 2:59 pm
Our client owns the building and occupies 50% of the square footage of a singularly metered building. The owner (our client) signed a contract to purchase... Last reply: Tristan Roberts, May 26, 2011, 7:32 am |
|
Water Closet BaselineCI-2009 WEp1: Water Use Reductionposted by Brandon Dark on May 12, 2011, 12:48 pm
Hello, I am working on a large LEED CI project where the tenant is occupying the majority of an existing building. The restrooms in this building prior to construction had 3.5 gpf blow-out... Last reply: Tristan Roberts, May 25, 2011, 9:16 pm |
|
VOC TestingNC-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Maya Karkour on May 6, 2011, 11:20 am
Hello, Do you guys know if the... Last reply: Nadav Malin, May 25, 2011, 7:19 pm |
|
Can a PC count for Campus?Pilot-Credits PC41: Wastewater Managementposted by Prudence Ferreira on May 24, 2011, 7:03 pm
If we were to certify a campus... Last reply: Batya Metalitz, May 25, 2011, 12:59 pm |
|
100% of energy generated by PVs at site--will it earn 19 points?NC-2009 EAc1: Optimize Energy Performanceposted by Brooks Critchfield on May 18, 2011, 9:51 am
We have a project on a "campus" site with existing buildings. The Owner has installed an extensive array of PVs which are shared by buildings on this site. The array is extensive enough to... Last reply: Brooks Critchfield, May 25, 2011, 12:03 pm |
|
questions of Install Drift Eliminators and minimum efficienciesPilot-Credits WEpc17: Cooling tower water useposted by Jie Zhang on Apr 1, 2011, 3:09 am
In the pdf download from usgbc.org, one of the credits requirements is 'install drift eliminators that achieve minimum efficiencies of 0.2% for counter-flow systems or 0.5% for cross-flow system... Last reply: Batya Metalitz, May 25, 2011, 11:57 am |
|
Vertical Fc at property lineNC-2009 SSc8: Light Pollution Reductionposted by JOSH FISHER on May 25, 2011, 11:14 am
What is the height off the ground at which the vertical Fc are are to measured at the property line? |
|
Tracking compacted trash and loose recyclablesEBOM-2009 MRc7: Solid waste management - ongoing consumablesposted by Kristen Salinas on May 4, 2011, 6:22 pm
My project is having problems tracking their trash and recyclables by volume. The trash is compacted 4:1 in a trash compactor. This trash remains in its compacted state even when it is in the... Last reply: Dan Ackerstein, May 25, 2011, 10:00 am |