Developer Owned On-Site Renewable Energy Sold to TenantsCS-2009 EAc2: On-Site Renewable Energyposted by Mark Frey on Jun 1, 2011, 11:14 am
We are working on a LEED CS project where the investor will sell the energy produced on-site by photovoltaic systems to the tenants in the project building, according to internal fees at a... Last reply: Tristan Roberts, Nov 21, 2011, 1:10 am |
|
vestibule instead of pressure differenceCS-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Nándor Kovács on Aug 1, 2011, 4:30 am
I found in ASHRAE 62.1-2004 standard that using a vestibule to provide airlock between garage and regulary occupied spaces is a compilant way to limit the entry of exhaust gases. Is it... Last reply: Tristan Roberts, Nov 21, 2011, 1:05 am |
|
Residential HVAC included in commissioning scope of LEED CS?CS-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Jorng-ren Chern on Oct 25, 2011, 6:22 am
I am working on a condominium project which is planning to certify LEED CS. The project owner will... Last reply: Tristan Roberts, Nov 21, 2011, 12:22 am |
|
Rainwater for irrigationCS-2009 WEc2: Innovative Wastewater Technologiesposted by Juan Robles on Jul 14, 2011, 6:17 pm
We are collecting rainwater and using it for maintenance in the common areas. At the same time, we are achieving a 62% potable water use reduction installing low flush fixtures. Does the... Last reply: Tristan Roberts, Nov 21, 2011, 12:20 am |
|
IEQc7.1NC-2009 IEQc7.1: Thermal comfort - designposted by Robert Shapero on May 27, 2011, 2:14 pm
Tristan, Is it possible to show a sample calc for credit 7.1. I am not sure how to calculate this and would welcome any insights as to how about providing this calculation. I was hoping to... Last reply: Tristan Roberts, Nov 20, 2011, 11:52 pm |
|
viscoseCI-2009 MRc6: Rapidly Renewable Materialsposted by Giselle Walsh on Oct 11, 2011, 2:18 pm
If a product has cotton and viscose blend, can I the entire product be considered rapidly renewable or just the cotton portion? Last reply: Tristan Roberts, Nov 20, 2011, 11:37 pm |
|
CalculationsCI-2009 MRp1: Storage and Collection of Recyclablesposted by Sheela I on Nov 17, 2011, 11:12 am
California has sizing guidelines for recycling areas. Do we need to use this % vs SF for any other state? Our project is in PA. Can you someone please let me know if we have follow these... Last reply: Tristan Roberts, Nov 20, 2011, 11:36 pm |
|
LEED CI- S.S. credit 3.3- Case 1- Option 2CI-2009 SSc3.3: Alternative transportation - parking availabilityposted by Sheela I on Aug 31, 2011, 4:17 pm
Our project area is less than 75% of the total building area - as we are one of the tenants in 25 floor building. So i guess the project would qualify under Case1 - Option 2. Can you someone... Last reply: Tristan Roberts, Nov 20, 2011, 11:35 pm |
|
WATER USE REDUCTIONCI-2009 WEc1: Water Use Reductionposted by sajeev john on Aug 29, 2011, 8:06 am
DOES THE COMMON TOILEST IN A FLOOR COME UNDER TENANT SCOPE? ENTIRE FLOOR IS OCUPIED BY SAME COMPANY? FLOOR IS MEANT TO BE RENT TO DIFFERENT TENANATS AND OUR COMPANY IS OCCUPYING THE ENTIRE FLOOR... Last reply: Tristan Roberts, Nov 20, 2011, 11:33 pm |
|
Automated controlCI-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Max Calabro on Apr 30, 2011, 8:46 pm
I notice the credit language here requires an alarm when CO2 levels are more than 10% above desired. We're installed our... Last reply: Tristan Roberts, Nov 20, 2011, 11:29 pm |