Forum quick links
Pilot Credit 45 - LEED for Retail
Pilot-Credits SSpc45:Site assessmentposted by Serena Wray on
The overall intent of the pilot credit is a good one - it requires a thorough analysis of several site considerations, including some that are not included in traditional site design.
Additional Interior Lighting power
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Luana Bertoletti on
I'm working on a project that has a space which is eligible for additional interior lighting.
SF6 GAS
NC-2009 EAp3:Fundamental Refrigerant Managementposted by MARIA FERNANDA CORREA on
The LEED NC V3 project we are working on has an electric system that requires an Electric Substation that has cells of medium tension which are protected with SF6 gas (sulfur hexafluoride), which
LEED EB Recertification - Where's the Value?
posted by K W on
What are the benefits/value of recertifying under the LEED EB program? We've been reviewing the recently released USGBC guide for LEED EB recertification, and it appears to be more difficult than
V4 Summary fo Changes?
posted by K W on
Is there a high-level scorecard or graphic that summarizes the updates/changes from LEED 2009 to LEED v4. We're most interested in EB and NC/CS. Thanks in advance.
Patriotism meets Efficiency
posted by Matthew Macko on
Never has efficiency, effectiveness and intelligence been questioned as much as it has in the worldwide pursuit of higher performing buildings.
What is a main corridor
CS-2009 PIf5:Building System Controlposted by Michael E. Edmonds-Bauer on
I just noticed that on PIf5 on Table PIf5-1 the second part refers to a main corridor and the third part refers to a secondary lobby/corridors.
Critical Zone Identification
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by sanjay vashishtha on
We are doing a project in which building is of office type and is having 75 AHUs and each AHU is serving one specific tenant area, means there are 75 tenant. Each tenant area is almost 10,000 SF.
Time for a Boycott?
posted by Rob Hink on
Hopefully we are all saving our money and not buying USA Today. What would it take start a boycott against this shoddy journalism?
EV Charging Station Monitoring
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Studio 804 on
I was told by a EV Charging Station manufacturer that LEED is revising their standards to require monitoring equipment be included on the units (to track usage, etc). Is this true?