Forum quick links
Defining 'one building'
NC-2009 PIf1:Minimum Program Requirementsposted by Erin Holdenried on
I have a project with two adjacent buildings that are basically physically distinct structures with a short enclosed corridor that connects the two. Can this project be considered one building?
Active ingredient
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Katherine Ann Resurreccion on
Hi All, Our client uses pesticides/chemicals in their facility, some are those that are commercially available or sold for household use, however the active ingredient is not present on the SF haz
WEc1 Option 2 Path 1
NC-2009 WEc1:Water Efficient Landscapingposted by Don Hardwick on
Hi, I have a project planning to use 100% non- potable water for irrigation.They are planning on doing this through collecting rain water.
UnmetLoadHours - Do we have clarity yet?
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
The definition of Unmet Load Hours has been vague for quite some time. ASHRAE 90.1 2010 was supposed to address this issue. Do we have some resolution about this yet?
Option 1 - is a residential element required?
CI-2009 SSc2:Development Density and Community Connectivityposted by R Jones on
If a project is pursuing option 1 development density calculations must there be a residential element recorded within the 60,000sf/acre figure? thank you
E -waste goes back to manufacturer
EBOM-2009 MRc8:Solid Waste Management—Durable Goodsposted by Anna Korinkova on
Our building has a large number of tenants with separate management. Their IT equipment go back to the manufacturer and do not go to the building main waste stream.
auto-shutoff faucets
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Jonathan Weiss on
I am sure this has been answered elsewhere in this listing but I am confused by the back and forth about auto-shutoff faucets, the most common commercial lavatory faucet in much of the work I am in
Legacy LEED AP
posted by Bonnie Richardson AIA, LEED AP on
Thanks so much for coming up with a simplified and reasonable way of documenting ongoing education!
Brewery Process Load - Baseline and Proposed Case Set-up
NC-2009 EAp2:Minimum Energy Performanceposted by Xun Jia on
The brewery I am modeling has large percentage of energy consumption associated with the process load.
IEQ Credit 1.1 I-BEAM Audit Parameter Conditions
posted by Jeff Schwab on
Hello LEEDuser.com community, My name is Pearl Frank. I am the Project Leader of a LEED EB Certification project on an existing campus building at Purdue University.