Individual Workstation Lighting Controls

Schools-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Kathy Trejo  on 

The individual workstation lighting controls section has changed with the version 4 form. We now must enter each space and provide documentation of each control for task lighting.

1
Sun Nov 25, 2012, 6:01 pm

Cistern volume

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Lucie Cervena  on 

I work on the project where it is impossible to design non-structural measures because soil can´t infiltrate almost any water.

1
Wed Nov 7, 2012, 12:19 pm

Addition to LEED Certified Building

LEED Rating System Selection
posted by  Melissa Wrolstad  on 

I have a client with a LEED-NC v2009 Certified Building. They would like to build an addition that will add approximately 30% more square footage to the building.

1
Fri Nov 23, 2012, 3:29 pm

Universal Design Features - Mid Rise

Pilot-Credits PC34:Design for Adaptability
posted by  Jennifer Palermo  on 

Richardson Lofts is an adaptive reuse of what was a 6 story jewelry factory built circa 1900 in downtown Newark, NJ, and turned into 67 loft dwelling units.

0

carpet tile approved as walk-off mat

Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Melissa Vernon  on 

Carpet tile is now an acceptable entryway system per LEED Interpretation Ruling ID#10252 https://www.usgbc.org/leedinterpretations/LISearch.aspx?liaccessid=10252 Carpet tile is a highly desired w

0

Carpet tile approved as acceptable walk-off mat

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Melissa Vernon  on 

Carpet tile is now an acceptable entryway system per LEED Interpretation Ruling ID#10252 https://www.usgbc.org/leedinterpretations/LISearch.aspx?liaccessid=10252 Carpet tile is a highly desired w

0

Energy modeling - ASHRAE §G3.1.2.4

NC-2009 EAp2:Minimum Energy Performance
posted by  Julien Daclin  on 

Hi all, We are undertaking the energy modeling of an office building and the Baseline is using a System 7, climatic zone is 4a.

1
Wed Nov 7, 2012, 4:16 pm

Plumbing & electrical out buildings and Space Usage table

NC-2009 PIf3:Occupant and Usage Data
posted by  Erin Holdenried  on 

I have a building that has multiple separate enclosed buildings for electrical, fire tanks, and water tanks.

1
Tue Nov 6, 2012, 11:46 pm

MPR6

Retail-NC-v2009 EAc5:Measurement and verification
posted by  Ward Miller  on 

Has anyone tried earning 1 point for MPR 6 on this credit as is available in other rating systems?

1
Fri Nov 23, 2012, 1:37 am

Building Density Clarification

CS-2009 SSc2:Development Density and Community Connectivity
posted by  James Wieben  on 

The sample calculations in the Tool Kit example all have a building on the property. My real life example has some areas with surface parking and no building.

1
Sun Nov 25, 2012, 12:56 am