Forum quick links
No cooling in Proposed Building
CS-2009 EAp2:Minimum Energy Performanceposted by Johannes Hopf on
Our proposed building has no cooling system installed; it is ventilated naturally. Now Appendix G says to model the proposed building like the baseline bldg system. That means with a VAV.
Plf3-3 FTE's
posted by Kay Sieck on
Just got my LEED review back, here is my dilemma, for a Convention Center we calculated FTE's with consideration to dark days, Set up days, Move-in/Move-out days, and Event Days taking into conside
Ventilation of a Backup Diesel Generator Closet
CI-2009 IEQp1:Minimum IAQ Performanceposted by Michael Wironen on
We have a small mechanical equipment room that contains a backup diesel generator. It is being ventilated to remove exhaust and excess heat.
One product, multiple IEQ credits?
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Katrina Morgan on
Should flooring adhesives take credit under IEQc4.1 or IEQc4.3, or both? Thank you!
LED Site Lighting
NC-2009 IDc1:Innovation in Designposted by buddy pribish on
Seems like a no brainer - substituting LED light fixtures in our parking lot will cut energy consumption by 80%. This does not seem to be covered in other LEED credits.
Gym with Daylight Provision
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Grace Ming on
We have a LEED-CI project with a small Gym. The gym has the daylight provision with full height window. Do we need to provide the photo cell sensors at the gym as well? Thanks.
Regularly unoccupied rooms
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Alicia Freire on
Hello, I am working on a data centre which, as it is common in this type of buildings, has a “Crisis room”.
Which rating system
posted by Magnus Stagnäs on
Our client is developing an office project consisting of three office towers with a common open plan ground floor and two common basement parking floors.
Base Building ASHRAE 62 Compiance
CI-2009 IEQp1:Minimum IAQ Performanceposted by breeze glazer on
IEQc1 requires confirmation that the building services have been designed in accordance with ASHRAE. A statement from the mechanical engineer is required to demonstrate this.
Multiple Units - Shared Returns
CI-2009 IEQp1:Minimum IAQ Performanceposted by Mike oliva on
Our design has four Dual Duct VAV units that share common plenum return that is recirculated thru both hot and cold deck of each unit. Each unit has it's own OA intake.