Forum quick links
Parking availabilty
CI-2009 SSc1:Site Selectionposted by Lavanya Veerappa on
The requriement of the credit - "parking availability" is to meet but not exceed local norms.
Thermal Contrillability: No of thermostat points and alternative
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Yong Lee Low on
We have a total of 2385 individual spaces and to provide thermostats for 50% of these is required to score a point. which means is it that we are required to provide 1193 numbers of thermostats?
These changes were usually reserved for the next LEED Vesion
posted by Hernando Miranda on
An amazing number of changes. A greater deal of complexity. This seems to be a USGBC response to the deferral of LEED v4.
Tristan, this service is
posted by Larry Sims on
Tristan, this service is greatly appreciated and yet another reason for sustainable professionals to support and promote LEEDuser!
New Regional Materials Distance
posted by Hernando Miranda on
(Distance by rail/3) + (Distance by inland waterway/2) + (Distance by sea/15) + (Distance by all other means). The sea distance converts to 7,500 miles.
International ACPs rolled into credit language
posted by Tristan Roberts on
As of the 7/6/12 LEED addenda release, USGBC has integrated the International ACPs into the regular LEED credit language—so rather than reviewing the standalone document, you can see the ACP option
LED Job-site lighting earns ID point
NC-2009 IDc1:Innovation in Designposted by Nadav Malin on
When we did an article in Environmental Building News a few months
Mineral-based flooring exempt
posted by Hernando Miranda on
In nearly all cases grouts used for ceramic tile installation are are cementitious and zero VOCs. This is of course not the case for elastic grouts. It does not make any sense why a product appli
WEc1 Month With Highest Irrigation Demand
posted by Hernando Miranda on
WEc1: Option to base calculations on the "the month with the highest irrigation demand. The way the calculations for this credit work -- if you have a normal irrigation system, meaning one withou
Schools SSc9 clarified
posted by Hernando Miranda on
"projects where no future development is planned are not eligible for this master planning credit." I work on a lot of school projects. I am wondering what "is planned" actually means.