CS-2009 EAp2:Minimum Energy Performanceposted by Mary Wilkerson on
nice thread. very interesting.
Does packaging count?
Schools-2009 MRc4:Recycled Contentposted by Kathy Trejo on
I recently recieved recycled content information for a products packaging, caulking tubes, paint pails, etc.
Dormitory LPD
NC-2009 EAp2:Minimum Energy Performanceposted by Rebekah Burke on
We have a 4 story college dormatory building, 113,000 SF.
Purchasing periods may not exceed 3 months?
posted by Jessica Bruscato on
I am currently pursuing LEED certification for a building and have been tracking various items that have been purchased during the last 6 months.
Calcium Magnesium Acetate?
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Elizabeth Crenshaw Hammitt on
Our purchasing team recently bought an ice melter that contains Calcium Magnesium acetate, which is not one of the three options that LEED specifies.
shuttle service instead of preferred parking space
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Karyn Rodrigues on
Our LEED CI project is inside of a LEED CS retrofit. For SS3.3 my client falls under the CASE 1.
PV Installation during EAp2 and EAc1 performance period
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by David Tompos on
My group is currently planning to have photovoltaic panels and the appropriate electricity meters installed on the LEED EBOM project building.
Fume hood & Isolated Exhaust Requirement
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maggie Hogan Skaug on
Our client has a fume hood in one of their laboratories but it is not within an enclosed room all to itself.
question
posted by Tarek Dalati on
my project is composed of a 52 residential building and 2 retails (g+1 and G+2) they are in the same project boundary and fed from the same HVAC systems ( chillers and boilers) the retails are bas
Salvaged granite block
NC-2009 MRc3:Materials Reuseposted by Sara Sweeney on
Hi I am working on a project where 83.75 tons of granite slabs were removed from a site during site clean-up for the new bilding being built.