Reintroduce two free CIRs

General forums
posted by  Mara Baum  on 

Remember when USGBC granted each project two free CIRs?

1
Wed Mar 21, 2012, 3:12 pm

EQ Credit: Acoustical Performance - Needs cleaning

General forums
posted by  Joseph F. Bridger  on 

If someone else has not submitted a comment, I have more than I submitted (one per credit per person and cannot edit!) 1. suggests a noise range must be met.

0

3rd Comment Period Extended to March 27

General forums
posted by  Tristan Roberts  on 

LEEDuser has gotten word that USGBC has extende the third public comment period for LEED 2012 to March 27th. So, keep on commenting!

1
Tue Mar 20, 2012, 7:15 pm

Construction Demolition Waste credit

General forums
posted by  Jennifer Frey  on 

Has anyone else checked the math on the MR Construction Demolition Waste credit?

0

Air Pollution Prevention

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Ellen Mitchell  on 

This week I have had two projects returned to me from the preliminary construction review with the same comment. I have never seen this comment before and am a little perplexed.

1
Tue Mar 27, 2012, 2:30 pm

EQ Credit: Acoustic Performance - Sound System Portion

General forums
posted by  Joseph F. Bridger  on 

I corresponded with our audio designers (Fred/Richard) and here is a summary of their comments. Since I submitted my comment already, I was not able to add their thoughts to the public comment.

0

Heat Island Reduction

General forums
posted by  Chris Munn  on 

There appears to be four options worth a total of two points.

0

Water Metering- Submetering- EB O&M

General forums
posted by  Chris Munn  on 

This credit is worth 2 points. According to the draft, you get 2 points for having two or more subsystems submetered, however if you only have one subsystem submetered, you get 0 points.

0

Retrocommissioning Investigation and Analysis

General forums
posted by  Chris Munn  on 

According to the draft, it appears that the commissioning investigation credit now requires both a Level II Audit and commissioning, as opposed to one or the other like the previous version.

0

Enhanced IAQ Strategies- EB O&M

General forums
posted by  Chris Munn  on 

Based on the way this credit appears in the draft, you get one point for having the 10 feet of matting, and then an additional point if you have either 1) MERV-13 filtration in place, 2) Carbon Dio