Forum quick links
openings on a direct naturally ventilated space
NC-2009 IEQp1:Minimum IAQ Performanceposted by Francesco Passerini on
A storage room with openings on a direct naturally ventilated space must meet the requirements of ASHRAE 62.1 for spaces without direct openings to the outdoors ventilated through adjoining rooms (
Carpet Material ??
CI-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Jan Senica on
We wanted to know if you could please help us out with the carpet material. At the entrance of each door, we are suppose to provide a carpet mat that is suppose to trap dust particles & contain
CI Toilets for employees vs customers
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Sustentator Argentina on
We are pursuing CI for a retail space inside a huge mall.
Move historic & blighted buildings to LT High Priority Site
posted by Mara Baum on
I really like some of the changes that LEED 2012 makes with respect to historic and blighted buildings.
Move historic & blighted buildings to LT High Priority Site
posted by Mara Baum on
I really like some of the changes that LEED 2012 makes with respect to historic and blighted buildings.
Low-Emitting Interior Credit: Positive Improvements
posted by Nicole Munoz on
The revisions in the proposed EQ credit Low-Emitting Interiors will strengthen the requirements, heighten the level of transparency, and increase the value of 3rd party certification.
how to determine cost-effectiveness
Pilot-Credits PC26:Advanced Energy Meteringposted by monu goyal on
how can we do calculations to determine cost-effectiveness for the incremental cost of the entire system and individual end-uses.
Not that so
posted by Ricardo Sobral on
I work for an international project and construction company implementing LEED certification. In my company, safe & safety issues are almost a dogma.
Reversing Exemplary Performance Claim
NC-2009 IDc1:Innovation in Designposted by Gail Vittori on
Our project is pursuing more than 4 innovation strategies. It is eligible and anticipates to achieve exemplary performance for 2 design phase credits.
Regional Materials - Mileage Info
NC-2009 MRc5:Regional Materialsposted by Mike Maas on
What should be done for a product that has numerous locations for extraction. For instance, my steel supplier has 47% regional materials, but the sources are from about a dozen different mills.