Forum quick links
No new parking except for 3 LE/FE spaces
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Nelina Loiselle on
I'm working on a campus building where we have added only 6 new spaces (3 of which are ADA) I understand the ADA can be exempted, but since the other 3 new ones are being added to be reserved for L
Having Trouble Getting Compliance for EAp2
NC-2009 EAp2:Minimum Energy Performanceposted by Brian ORourke on
I am working on a LEED project and we hired an engineer to run an energy model on EQuest.
basement level with outdoor terrace for roof?
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Erica Downs on
We have basement level rooms that extend beyond the above-grade building footprint. Effectively, the terrace serves as the roof for these below-grade rooms.
10 fc or 25 fc ?!!
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Nelina Loiselle on
Please help...why does your "Credit Language" section read minumum 10 fc, but the LEED 2009 guide and other comments on this thead refference minimum 25 fc?!!
off-site renewable with local utility
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Wendy Gibson on
We currently participate in our natural gas utility provider's off-set program and off-set all of our natural gas usage.
Modeling Narrative Upload?
NC-2009 EAp2:Minimum Energy Performanceposted by Dave H on
I am documenting an energy model for LEED 2009 EAp2/EAc1 and I would like to include a document that describes the modeling techniques used for each modeled system.
Plastic Laminates
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Sheela I on
Do we have to list Plastic laminate products (like Wilsonart) for this credit?
Rated Power
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Sheela I on
How can i calculate rated power for appliances & laptops? Can i convert the Voltz into Watts and would that be the Rated power of the equipment?
time green cleaning needs to be in place
EBOM-2009 IEQp3:Green Cleaning Policyposted by Gita Nandan on
I am wondering if we are applying this credit as an innovation credit for a NC project, if it needs to be in place before the tenants have moved in, or is there a window of time within which it is
IAQ Flush Out
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by J Morrison on
I would like to know what documentation is acceptable to USGS on the flush out process? Is there documentation from the BAS system required?