Forum quick links
Performance period - general info
posted by Andy Plogsted on
I have not been able to find out much info on perf periods, so I have a few questions.
NC Major Renovation with minimal site disturbance
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Monika Mickute on
Dear LEEDUsers, We are working towards certifying our own office building (an existing 50 year old, single story structure of ~7,000 sf on a 0.64 ac lot).
WC average flow rate for residential use
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Udana Ratnayake on
we are working on a hotel project where the guest rooms are provided with dual flush (4.5L/3L) WCs. no urinals are provided.
Home Automation in Multifamily High Rise Residential Project
NC-2009 EAc1:Optimize Energy Performanceposted by Omer Moltay on
Dear All, Would it be possible to claim EAc1 credits for local automation in dwelling units to achieve the following: (1) Automatic shut down of lighting and HVAC units when there is no occupancy
Tenant leases, credit for upgrades other than LPD reduction?
CS-2009 EAc1:Optimize Energy Performanceposted by Dan LeBlanc on
Has anyone been successful in claiming savings in tenant spaces for anything other then lighting power reductions? Demand controlled ventilation, daylight sensors or plug load reductions perhaps?
Carpark and definition of GFA
CS-2009 EAc1:Optimize Energy Performanceposted by Puteri Shireen Jahnkassim on
Dear Sir/Madam We are certifying a large retail mall which have a large carpark block ( five levels).
Complying with Natural Ventilation Req. in a Apartment Bldg.
NC-2009 IEQp1:Minimum IAQ Performanceposted by Rob Hink on
We have a multi unit high rise residential bldg. and we are attempting to provide natural ventilation to all units using the operable windows and sliding doors.
E-85 at a gas station?
NC-2009 EAc2:On-Site Renewable Energyposted by April Ambrose on
We are doing LEED Volume under NC-Retail for a gas station chain that sells E-85 at all locations. Does E-85 qualify as On-Site Renewable Energy?
when to use prescriptive vs simulation
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Denise Santini on
In what kind of space would you use a prescriptive method for calculating daylight. it seems as it only applies to open office spaces in a small floor plate.
Pilot Credit #44 Ergonomics Strategy - wall /work surface ratio
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Cindy Davis on
I received a second review comment “Documentation demonstrating that on-site measurements or product data for finishes to demonstrate an average wall-surface-to-work surface illuminance ratio does