Epoxy Flooring Again
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Mary Kay on
I have a product by Sherwin-Williams "Tile-Clad High Solids" w/ a VOC of 374 g/l.
'Expected Volume for the Building' Question
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Rebekah Burke on
How do we address the expected volume of recycling for the building question? This is a question we received recently on a design review, and I'm not certain how to address.
DES Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by SUNG SU KIM on
For HVAC System, Our project team will apply to 2 absorption chillers and geo-exchange heat pump.(project site is located in DES) In this case, we know that the baseline system of HVAC is absorpti
Consistency, Consistency, Consistency
posted by April Ambrose on
I think my main issue with this announcement is the lack of consistency in the way that USGBC/GBCI is making these decisions and announcements.
Speculative Project - Tenant Lease Upload
posted by Zachary Guren on
Our LEED Core & Shell project is a retail building that will have multiple tenants, but it is a speculative project (as we indicate at the top of the second page of PI Form 3).
Design for Adaptability
Pilot-Credits PC34:Design for Adaptabilityposted by Jeffrey Lewis on
As a Senior Building, this credit was pretty much a given.
Refueling Station As a Separate Project
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Sarah Corbitt on
Hi, there. The project I'm submitting does not have parking within the project boundary. It's a Core and Shell renovation on a tight urban lot.
Benefits of LEED NC or CS
posted by Nathan Lee on
I am working on a mixed-use project which includes, office space, hotel, and some retail.
EU Standards vs LEED
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Tanja Arnesson on
We have some problem with the VOC (g/l) content in our products.
Reclaimed land near landfill
NC-2009 SSc3:Brownfield Redevelopmentposted by William Wong on
One of my projects choose to develop on a piece of land that is reclaimed and near an operating landfill and as thought in the design stage land contaminant would very likely to be found.